Layered Process Audits (LPA) - Chrysler
Layered Process Audits (LPA) - Chrysler
Layered Process Audits (LPA) - Chrysler
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Date:______________Project<br />
#______________<br />
Item # <strong>LPA</strong> Question Expectations Y/N Corrective Action & Timing<br />
JOB SET-UP<br />
19<br />
20<br />
21<br />
22<br />
23<br />
• SHIFT DOWN / START OF PRODUCTION<br />
All questions are to be answered with a "Y" for yes (acceptable or compliant), or "N" for no (unacceptable or<br />
non-compliant) in the status box.<br />
Non-compliances are to have corrective action with timing recorded in the space provided.<br />
Assumptions for using this document:<br />
- Intent of these questions is that the operator is performing a new operation.<br />
- Normal <strong>LPA</strong> is being followed.<br />
- On-going manufacturing process remains in place.<br />
Have process set-up procedures been reviewed<br />
and updated to account for volume reductions?<br />
Have you reviewed the volume reduction with<br />
your Supply Base, including risk assesments,<br />
cascading requirements, and responsibilities?<br />
Have any necessary process changes in your<br />
Supply Base been communicated to you, and<br />
requested and approved by <strong>Chrysler</strong> through the<br />
"Forever" Requirements?<br />
Are all appropriate personnel (at your facility and<br />
in the Supply Base) trained in the "Forever"<br />
Requirements system (e.g. when to initiate a<br />
"Forever" Requirements change request, how to<br />
use the WebCN/FR system, etc.)? Have all<br />
potential "Forever" Requirements changes been<br />
approved by <strong>Chrysler</strong>?<br />
Have all potential "Forever" Requirements<br />
changes been approved by <strong>Chrysler</strong>?<br />
SUPPLY BASE MANAGEMENT<br />
FOREVER REQUIREMENTS<br />
The Supplier has documented process set-up<br />
procedures/instructions, including easy<br />
access to set-up requirements (e.g. control<br />
limits, independent verification, first-piece/lastpiece<br />
approval procedures, etc).<br />
Communicate to the Supply Base on the<br />
impact of volume reductions. Share risk<br />
analysis.<br />
Ensure communication through the Supply<br />
Base regarding all process changes.<br />
Proactively communicate with <strong>Chrysler</strong>, know<br />
when to raise the flag<br />
Notify <strong>Chrysler</strong> of proposed material or<br />
process changes<br />
Notify <strong>Chrysler</strong> of proposed manufacturing<br />
changes<br />
Watch for sub supplier issues and tell<br />
<strong>Chrysler</strong> about them<br />
Notify <strong>Chrysler</strong> of potential supply / capacity<br />
issues<br />
Proactively communicate with <strong>Chrysler</strong>, know<br />
when to raise the flag<br />
Notify <strong>Chrysler</strong> of proposed material or<br />
process changes<br />
Notify <strong>Chrysler</strong> of proposed manufacturing<br />
changes<br />
Watch for sub supplier issues and tell<br />
<strong>Chrysler</strong> about them<br />
Notify <strong>Chrysler</strong> of potential supply / capacity<br />
issues<br />
64