04.07.2013 Views

Layered Process Audits (LPA) - Chrysler

Layered Process Audits (LPA) - Chrysler

Layered Process Audits (LPA) - Chrysler

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Date:______________Project<br />

#______________<br />

Item # <strong>LPA</strong> Question Expectations Y/N Corrective Action & Timing<br />

JOB SET-UP<br />

19<br />

20<br />

21<br />

22<br />

23<br />

• SHIFT DOWN / START OF PRODUCTION<br />

All questions are to be answered with a "Y" for yes (acceptable or compliant), or "N" for no (unacceptable or<br />

non-compliant) in the status box.<br />

Non-compliances are to have corrective action with timing recorded in the space provided.<br />

Assumptions for using this document:<br />

- Intent of these questions is that the operator is performing a new operation.<br />

- Normal <strong>LPA</strong> is being followed.<br />

- On-going manufacturing process remains in place.<br />

Have process set-up procedures been reviewed<br />

and updated to account for volume reductions?<br />

Have you reviewed the volume reduction with<br />

your Supply Base, including risk assesments,<br />

cascading requirements, and responsibilities?<br />

Have any necessary process changes in your<br />

Supply Base been communicated to you, and<br />

requested and approved by <strong>Chrysler</strong> through the<br />

"Forever" Requirements?<br />

Are all appropriate personnel (at your facility and<br />

in the Supply Base) trained in the "Forever"<br />

Requirements system (e.g. when to initiate a<br />

"Forever" Requirements change request, how to<br />

use the WebCN/FR system, etc.)? Have all<br />

potential "Forever" Requirements changes been<br />

approved by <strong>Chrysler</strong>?<br />

Have all potential "Forever" Requirements<br />

changes been approved by <strong>Chrysler</strong>?<br />

SUPPLY BASE MANAGEMENT<br />

FOREVER REQUIREMENTS<br />

The Supplier has documented process set-up<br />

procedures/instructions, including easy<br />

access to set-up requirements (e.g. control<br />

limits, independent verification, first-piece/lastpiece<br />

approval procedures, etc).<br />

Communicate to the Supply Base on the<br />

impact of volume reductions. Share risk<br />

analysis.<br />

Ensure communication through the Supply<br />

Base regarding all process changes.<br />

Proactively communicate with <strong>Chrysler</strong>, know<br />

when to raise the flag<br />

Notify <strong>Chrysler</strong> of proposed material or<br />

process changes<br />

Notify <strong>Chrysler</strong> of proposed manufacturing<br />

changes<br />

Watch for sub supplier issues and tell<br />

<strong>Chrysler</strong> about them<br />

Notify <strong>Chrysler</strong> of potential supply / capacity<br />

issues<br />

Proactively communicate with <strong>Chrysler</strong>, know<br />

when to raise the flag<br />

Notify <strong>Chrysler</strong> of proposed material or<br />

process changes<br />

Notify <strong>Chrysler</strong> of proposed manufacturing<br />

changes<br />

Watch for sub supplier issues and tell<br />

<strong>Chrysler</strong> about them<br />

Notify <strong>Chrysler</strong> of potential supply / capacity<br />

issues<br />

64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!