Vol 23 No 3 AMMJ 39<br />
PM Reviews at Sydney Water<br />
Table notes for Figure 4 & Figure 5:<br />
1. HIDRA Maintenance Safety<br />
Risk:– The HIDRA assessment for<br />
“Maintenance Safety Risk” is the risk<br />
to personnel while maintenance is<br />
being performed on the asset.<br />
2. HIDRA Process Risk - The HIDRA<br />
assessment for “Process Risk” is<br />
the risk to the Process failing if this<br />
maintenance activity is eliminated<br />
(both Operational & Environmental), if<br />
“run to fail” strategy is adopted for the<br />
asset.<br />
3. Type of Maintenance overall - CBM<br />
/ COM / PSM / RFM<br />
a. CBM = Condition Based Monitoring<br />
b. COM = Combined Time/Meter and<br />
Condition Based Monitoring<br />
c. PSM = Periodic Time or Meter<br />
Maintenance Only<br />
d. RFM = Run to Failure<br />
4. Type of Preventative maintenance<br />
a. Lub = Lubrication Maintenance<br />
b. M = Mechanical Maintenance<br />
c. E = Electrical Maintenance<br />
d. I = Instrumentation Maintenance<br />
e. O = Operational Maintenance<br />
f. VIB = Vibration Monitoring<br />
g. OIL = Oil Chemical Analysis<br />
h. Thermo = Thermal Image Analysis<br />
i. MCA = Machine Current Analysis<br />
j. Other = Any other Maint. type<br />
Assessment Financial 1 Political /<br />
Reputation<br />
Catastrophic<br />
Very High impact<br />
with very<br />
significant<br />
consequences<br />
Severe<br />
High impact with<br />
major<br />
consequences<br />
Corporate: ><br />
$100m<br />
Project: Cost<br />
overrun >= 50% of<br />
project budget<br />
Corporate: ><br />
$50m - $100m<br />
Project: Cost<br />
overrun > 20% and<br />
< 50% of project<br />
budget<br />
Corporate: ><br />
$10m - $50m<br />
Moderate<br />
Project: Cost<br />
Noticeable impact<br />
with clearly visible<br />
consequences<br />
overrun > 10% and<br />
< 20% of project<br />
budget<br />
Loss of Govt and<br />
widespread<br />
community<br />
confidence.<br />
Sustained key<br />
adverse media.<br />
Considerable Govt<br />
and community<br />
concern. Key<br />
adverse media.<br />
Some public<br />
concern raised.<br />
Adverse local<br />
media.<br />
Corporate: > $5m -<br />
$10m<br />
Minor<br />
Project: Cost<br />
Minor impact with<br />
Minor public<br />
overrun > 5% and<br />
some<br />
concern.<br />
< 10% of project<br />
consequences<br />
budget<br />
Insignificant<br />
Very minor<br />
impact with<br />
unimportant<br />
consequences<br />
Corporate: < $5m<br />
Project: Cost<br />
overrun < 5% of<br />
project budget<br />
Minimal public<br />
concern.<br />
Environment<br />
Large scale, irreversible,<br />
uncontained harm to the<br />
environment.<br />
Large scale, long-term<br />
(>2 years), uncontained<br />
harm to the environment.<br />
Small scale, mediumterm<br />
(1-2 years),<br />
uncontained harm to the<br />
environment eg small fire<br />
on SW site that damages<br />
adjoining protected<br />
bushland<br />
Catastrophic<br />
Severe<br />
Moderate<br />
Minor<br />
Insignificant<br />
Levels<br />
Very Likely<br />
Likely<br />
Unlikely<br />
Very Unlikely<br />
Figure 6 HIDRA Information – Level of Risk Matrix<br />
Very Likely Likely<br />
Unlikely Very Unlikely<br />
1<br />
1<br />
2<br />
3<br />
4<br />
Description<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Figure 7 HIDRA Information – Likelihood Descriptions<br />
Safety (Sydney Water<br />
& Public Safety)<br />
Fatality, amputation of<br />
limb, person on life<br />
support, other<br />
immediately life<br />
threatening incidents.<br />
W idespread serious<br />
injuries or illnesses.<br />
A serious injury or long<br />
term illness, or lost time<br />
injury (minimum 1 day<br />
lost per injury).<br />
Significant near miss<br />
incident; Injury or illness<br />
requiring medical<br />
treatement.<br />
The event could happen sometime (50% - 90%)<br />
Will probably occur at some time within a 12 month period<br />
The event could happen but very rarely (10% - 50%)<br />
Might occur at some time in a 12 month period<br />
The event could happen but probable never will (< 10%)<br />
Unlikely to occur within a 12 month period<br />
2<br />
3<br />
4<br />
5<br />
6<br />
The event could happen at any time (> 90%)<br />
A strong probability of multiple occurrences within a 12 month period<br />
Customers Public Health Performance 2<br />
Complete disruption<br />
to services > 1<br />
week. Affects ><br />
30% of SW C<br />
customers.<br />
Partial disruption ><br />
2 days. Affects<br />
10% to 30% of<br />
customers in<br />
system.<br />
W idespread<br />
complaints.<br />
Unreliable services.<br />
Increase in number<br />
of complaints. 5% to<br />
10% of customers<br />
affected.<br />
Short-term (< 1 year),<br />
reversible, contained Illness or injury requiring<br />
Multiple customer<br />
harm to the environment. first aid eg. Minor burns,<br />
complaints.<br />
eg. Damage to a heritage abrasions, sprains.<br />
listed building<br />
Temporary, reversible,<br />
environmental<br />
Near misses incidents.<br />
degradation eg. Industrial<br />
noise emissions at night<br />
Isolated customer<br />
complaints.<br />
W idespread<br />
illness / fatalities.<br />
Serious illness<br />
requiring<br />
hospitalisation.<br />
Deterioration in<br />
water quality<br />
parameters.<br />
Reportable event.<br />
Increase in<br />
illness.<br />
Very significant nonperformance<br />
against:<br />
. corporate goals and<br />
targets<br />
. project objectives and<br />
targets.<br />
Significant non-performance<br />
against:<br />
. corporate goals and<br />
targets<br />
. project objectives and<br />
targets.<br />
Non-performance against:<br />
. corporate goals and<br />
targets<br />
. project objectives and<br />
targets.<br />
Deterioration in Some non-performance<br />
water quality against:<br />
parameters. . corporate goals and<br />
Reportable event. targets<br />
No increase in . project objectives and<br />
illness.<br />
targets.<br />
Non-reportable<br />
event.<br />
Very minor non-performance<br />
against:<br />
. corporate goals and<br />
targets<br />
. project objectives and<br />
targets.<br />
3<br />
4<br />
5<br />
6<br />
6<br />
Compliance<br />
Significant compliance<br />
breach - may result in:<br />
Operating Licence<br />
sanction, high-impact<br />
prosecution eg Tier 1<br />
POEO Act offence.<br />
Compliance breach -<br />
may result in severe<br />
enforcement action,<br />
regulatory sanction or<br />
prosecution eg Tier 2<br />
POEO Act offence.<br />
Compliance breach -<br />
may result in Ministerial<br />
requirement,<br />
enforceable undertaking<br />
or statutory fine eg<br />
POEO Act Penalty<br />
Infringement Notice.<br />
Compliance breach -<br />
may result in minor<br />
corrective action or<br />
business requirement.<br />
Technical compliance<br />
breach with limited<br />
material impact.<br />
Financial limits for projects are a guide only. Actual amounts should be set at an appropriate level (based on business case value) for each individual project prior to conducting a risk assessment.<br />
Performance category descriptions are a guide only and may be further enhanced by divisional procedures.<br />
Figure 8 HIDRA Information – Consequences Details