Vol 23 No 3 AMMJ<br />

41<br />

Figure 11 Example PM Job Plan Sequences in the CMMS<br />

Figure 12 Example PM with a Route Assigned in the CMMS<br />

PM Reviews at Sydney Water<br />

Some non-critical low cost assets may be grouped into a PM Route as shown below in Figures 12 & 13. PM<br />

Routes are useful for grouping common assets with the same frequency of maintenance for a process/area<br />

at a plant or facility, where it is not essential to accurately track the total PM costs in CMMS for the asset.<br />

Example: Asset lubrication runs for an area, or low cost assets like all motors under 15kw for an area etc.