Chapter ñ12 Final Report: Thiruvathipuram <strong>Municipal</strong>ity<br />

encompassing audits for energy saving performance, design & implementation of<br />

conservation measures, maintenance, operation and management of the<br />

introduced facilities and procurement of project funds. ESCOs conduct retrofitting<br />

for energy conservation without damaging the environment. The ESCO will<br />

guarantee the savings that would meet or exceed the annual payments to cover<br />

up the entire project costs usually a period of 5 to 10 years. The savings can be<br />

shared proportionately with the institution for which the project is designed and<br />

implemented for.<br />

The salient features of performance contracting for energy savings through ESCO<br />

based business model are as under:<br />

1 'Nil' investment by customer.<br />

2. ESCO to identify Energy Efficient Measures (EEMs) to replace / modify existing<br />

in efficient systems.<br />

3. ESCO supplies, installs and maintains the Energy Efficient Measures (EEMs)<br />

during the contract period.<br />

4. Contract period could be 3-5 years or as mutually agreed upon.<br />

5. Energy saving is shared between ESCO and customer as per agreed terms.<br />

Total project cost is funded by ESCO. The O & M expenses will be met by the<br />

<strong>Municipal</strong>ity.<br />

6. Guarantee Energy savings and recover its investment including interest &<br />

other costs out of generated energy savings.<br />

Sl.No Reforms<br />

1 Energy audit<br />

Table 12-5: Road Map for Energy and Resource efficiency<br />

i Leak detection study √<br />

ii Fixing of bulk water meter √<br />

. - 98 -<br />

Year of Implementation<br />

Year 1 Year 2 Year 3 Year 4 Year 5<br />

iii Fixing flow control values and meters √<br />

iv<br />

Implementing energy saving<br />

measures on street lights and<br />

pumping machineries (ESCo)<br />

12.4.6 ACTION PLAN: COMPUTERIZATION AND E-GOVERNANCE<br />

Strategy options<br />

1. Launch data warehousing on a large scale, which would avoid cross-<br />

reference to paper record, which are time consuming and also preservation<br />

of paper media, which occupies space, could be avoided.<br />

2. Computerization of bill payment and facilitation of on line payments<br />

3. Computerisation of registration of land records within <strong>Municipal</strong> limit<br />

√<br />