22.07.2013 Views

City Development Plan - Municipal

City Development Plan - Municipal

City Development Plan - Municipal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter ñ8 Final Report: Thiruvathipuram <strong>Municipal</strong>ity<br />

8.1.6 ISSUES IN WATER SUPPLY SECTOR<br />

The piping mains and distribution lines were laid in 1952 are now out lived and<br />

cannot sustain the pressure.<br />

Water supply is inadequate so the people are forced to use un protected and<br />

polluted source of water.<br />

Large number of household depends on piped water supply which is<br />

inadequate and people are forced to use alternative water sources, which<br />

may be infected by microbial pollution.<br />

Amdebkar nagar area is getting low pressure flow.<br />

All the 200 mm dia distribution pipes are AC pipes only.<br />

Location of new infiltration wells to be indentified.<br />

The system is running to its full capacity, yet not able to meet the current<br />

demand and there is a need to industry new water sources and<br />

comprehensive improvement of the water supply system.<br />

Increasing economic activities in the town, increases the need of water<br />

supply.<br />

The old water supply scheme can not sustainably fulfill the demand of the<br />

town. And the in future it will not be able to withstand pressure for additional<br />

demand.<br />

250 mm and 300 mm dia pumping mainís material of construction is AC only.<br />

Hence it is not able to sustain the pressure.<br />

Due to the absence of generators at the pumping station, water can not be<br />

pumped during power failure and EB shut down.<br />

The proposal to meet the demand is given in chapter 10.<br />

. - 45 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!