City Development Plan - Municipal
City Development Plan - Municipal
City Development Plan - Municipal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter ñ8 Final Report: Thiruvathipuram <strong>Municipal</strong>ity<br />
8.1.6 ISSUES IN WATER SUPPLY SECTOR<br />
The piping mains and distribution lines were laid in 1952 are now out lived and<br />
cannot sustain the pressure.<br />
Water supply is inadequate so the people are forced to use un protected and<br />
polluted source of water.<br />
Large number of household depends on piped water supply which is<br />
inadequate and people are forced to use alternative water sources, which<br />
may be infected by microbial pollution.<br />
Amdebkar nagar area is getting low pressure flow.<br />
All the 200 mm dia distribution pipes are AC pipes only.<br />
Location of new infiltration wells to be indentified.<br />
The system is running to its full capacity, yet not able to meet the current<br />
demand and there is a need to industry new water sources and<br />
comprehensive improvement of the water supply system.<br />
Increasing economic activities in the town, increases the need of water<br />
supply.<br />
The old water supply scheme can not sustainably fulfill the demand of the<br />
town. And the in future it will not be able to withstand pressure for additional<br />
demand.<br />
250 mm and 300 mm dia pumping mainís material of construction is AC only.<br />
Hence it is not able to sustain the pressure.<br />
Due to the absence of generators at the pumping station, water can not be<br />
pumped during power failure and EB shut down.<br />
The proposal to meet the demand is given in chapter 10.<br />
. - 45 -<br />
Voyants Solutions Private Limited