22.07.2013 Views

City Development Plan - Municipal

City Development Plan - Municipal

City Development Plan - Municipal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annexure Final Report: Thiruvathipuram <strong>Municipal</strong>ity<br />

Parks and playground for children should be maintained well as now they are<br />

used as dumping yard.<br />

There is a need to increase the incentive of the councilor so that they can<br />

perform their duty in an effective way<br />

The roads are encroached in town and there is a heavy congestion near the Bus-<br />

Stand so need to regularize the development.<br />

Mr.T.K.Arul Mozhi TNEB AE<br />

Enough Light fittings are required for immediate rectification.<br />

Time switches in transformers have to be provided to save power.<br />

Mr.N. Kanasabai A.H.M Govt High School and Mr.K.Anbarasu Teacher, Govt high School<br />

Stray dogs in the school campus to be caught out<br />

In around school compound greens to be developed to avoid urination.<br />

Along the school side storm water drains to be cleaned daily and bleaching<br />

powder to be applied for odour control.<br />

School structures to be renovated.<br />

S.K. Babu Secretary, Traders union<br />

Market to be renovated.<br />

Compound wall to be constructed to avoid entry of stray animals in to the<br />

market.<br />

New shops to be constructed<br />

Solid waste to be collected regularly.<br />

New shopping complex to be constructed in the sandhai medu and in front of<br />

the municipal office premises.<br />

Scattered vegetables stall all over the municipality such that all the citizens buy at<br />

market rate.<br />

Mr.K. Thirughanasambantham Exnora member<br />

Organic waste to be converted in to manure.<br />

Provision for private participation to encouraged for solid waste management.<br />

Compost yard in the municipal office premises is to used for manure generation.<br />

Mr.Senthil Kumar AE National Highway<br />

Laying of pipe lines should be at least 1.5 m below the ground level and away or<br />

along the service corridor of the road.<br />

Since, minor changes in the roads will affect the pipe line if it is laid just below the<br />

ground level.<br />

Pucca drains to be constructed along the road sides to avoid flooding on the<br />

roads.<br />

Mr.Mohanam Rotary Club, Cheyyar<br />

There is a need to increase the incentive of the councilor so that they can<br />

perform their duty in an effective way<br />

- 144 -<br />

Voyants Solutions Private Limited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!