Chapter ñ 1 Final Report: Thiruvathipuram <strong>Municipal</strong>ity<br />

TOWN SPECIFIC COMMENTS<br />

Ranipet<br />

Address the requirement of staff quarters and indicate the same as a project<br />

in CIP in consultation with the ULB.<br />

The staff quarters (24 units) at a proposed cost of Rs.150.00 lakhs has been<br />

added to the CIP in consultation with the ULB.<br />

Update the details on the Bus Stand project at Muthukadai adjoining Pinji<br />

Lake in consultation with the ULB.<br />

As bus stand cannot be proposed on ëland under water bodies ë, an alternate<br />

site for the proposed bus stand needs to be identified by the <strong>Municipal</strong>ity. The<br />

details are given in section 10.1.6 chapter -10<br />

Highlight the impact on discharge of polluted water in to Palar river.<br />

The impact of effluent discharge into River Palar has been highlighted in<br />

section 5.3 of chapter 5 based on various reports prepared by NEERI, TNPCB ,<br />

CPCB and Palar River Basin Management and <strong>Development</strong> Board.<br />

Thiruvathipuram<br />

The consultants were requested to<br />

Update the details on the assets in consultation with the ULB.<br />

The details of assets have been updated under section 13.2.1 of chapter 13.<br />

Revise the Bus Stand improvement project in consultation with the ULB.<br />

The cost for proposed shopping complex and lodge inside the bus stand is<br />

revised in consulting with ULB and revised cost is mentioned in section 10.1.6<br />

chapter ñ 10.<br />

Madhavaram<br />

The consultants were requested to revise the assumptions on means of<br />

finance in accordance with JNNURM norms and revise the FOP<br />

accordingly.<br />

The means of Finance for Madhavaram have been revised as per JnNURM<br />

scheme. The assumptions are give in the table ëProjects Identified for<br />

implementation based on financial positioní in the executive summary.<br />

The minutes of meeting for review committee held during this period of study is given<br />

in Annexure I d.<br />

. - 13 -<br />