25.07.2013 Views

CFHT operating manual - Homepage Usask

CFHT operating manual - Homepage Usask

CFHT operating manual - Homepage Usask

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CFHT</strong> Observatory Manual - Observatory (Sec.3) http://www.cfht.hawaii.edu/Instruments/ObservatoryManual/CFH...<br />

<strong>CFHT</strong> Observatory Manual<br />

Section 3 - THE OBSERVATORY<br />

TABLE OF CONTENTS<br />

<strong>CFHT</strong> Observatory Facilities<br />

Building General<br />

These pages show the floor plans of each level in the dome. (under<br />

construction)<br />

1st (Ground) Floor<br />

2nd Floor<br />

3rd Floor<br />

4th Floor<br />

5th (Dome) Floor<br />

Live video images can be received at various locations in the building. The<br />

following are some useful channel allocations.<br />

Channel 03: TV guiding camera (Cass and Coude)<br />

Channel 06: Dome slit low light camera<br />

Channel 07: West view of inside dome<br />

Channel 08: Main entrance door<br />

Channel 09: East view of inside dome<br />

Channel 10: South view of telescope<br />

Visitors are reminded that, in keeping with staff safety<br />

requirements, hard hats should be worn at all times when<br />

working in the dome area and main hatch area.<br />

Dome Cooling and Ventilation (5th Floor)<br />

The temperature of the dome area is controlled via a series of sensors distributed<br />

throughout the dome and coupled to the<br />

building glycol system. Cooling coils are imbedded in the concrete floor.<br />

Ventilation of the dome is controlled primarily by<br />

the motorized louvers at the top and bottom of the dome structure. These vents<br />

1 of 10 08/07/04 11:21 PM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!