<strong>CFHT</strong> Observatory Manual - Observatory (Sec.3) http://www.cfht.hawaii.edu/Instruments/ObservatoryManual/CFH...<br />

comfortable furniture, and a kitchenette. This facility<br />

is for use by observers, staff, and guests for short rest periods during the day or<br />

night.<br />

Observers are requested to leave the kitchen in good order, especially during<br />

weekends when no cleaning staff is on duty.<br />

On the third floor there is one small bedroom and a washroom for use by<br />

personnel during day or night. These bedrooms are<br />

humidified but not pressurized. Individuals should remember that sleeping at<br />

4200 m is very difficult, and not always<br />

recommended, unless one is fully acclimatized.<br />

Weather Station<br />

A weather station is mounted on a tower adjacent to the dome. Readouts of the<br />

weather station instruments are found directly<br />

above the TV monitors at the telescope control console. A chart recorder view is<br />

also availible, on the Telescope Status monitor<br />

of the Telescope Control System (TCS). The instrument levels are shown in<br />

colored traces. Several FITS keywords of<br />

potentially useful weather data are added to the FITS header of each image file.<br />

Compressed Air<br />

Seven-bar filtered and dried compressed air is available for use by Observers at<br />

the following locations:<br />

instrument labs<br />

upper coudé slit room<br />

telescope Cassegrain focus<br />

optics labs (including the LAMA room)<br />

Glycol Cooling System (this section needs updating and inclusion of the<br />

MegaPrime cooling system)<br />

Because of the expense of trucked water, a recirculating cooling system has<br />

been installed for all cooling purposes by<br />

observers.<br />

The cooling points are equipped with a valved supply line and a drain and are<br />

installed in the following locations:<br />

coudé rooms and coudé auxiliary rooms<br />

infrared laboratory<br />

instrumentation preparation room<br />

Coolant characteristics are as follows:<br />

maximum flow: 40 liters/minute<br />

maximum pressure: 5 bars<br />

incoming temperature: 10oC (adjustable)<br />

Dry Nitrogen<br />

5 of 10 08/07/04 11:21 PM