CFHT operating manual - Homepage Usask
CFHT operating manual - Homepage Usask
CFHT operating manual - Homepage Usask
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ESPaDOnS: instrument status http://webast.ast.obs-mip.fr/magnetisme/espadons_new/status.html<br />
Technical nights and science verification time<br />
A total of 6 technical nights are scheduled in 3 blocks of 2 nights each, for checking a number of issues that could not be reliably<br />
estimated in the lab (eg measuring the absolute efficiency of the instrument by using stars of known colour and magnitude).<br />
Although no official announcement was made by <strong>CFHT</strong> authorities, preliminary information from <strong>CFHT</strong> staff indicates that<br />
technical runs are scheduled for early September, late September and late October 2004.<br />
Similar information indicates that science verification nights are scheduled for late November 2004.<br />
Availability to the general community<br />
In principle and if no further problems appear in the coming few months, ESPaDOnS should be open to the general community<br />
for semester 2005A, with proposals to be submitted to the TACs by mid September 2004.<br />
© Jean-François Donati, last update June 08 2004<br />
2 of 2 08/07/04 11:33 PM