01.08.2013 Views

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. CS<br />

No.4596<br />

, Ward<br />

No.4,<br />

Bharuc<br />

h, Shri<br />

Amirbe<br />

g<br />

Nazirbe<br />

g Mirza,<br />

C/1709,<br />

Malbari<br />

Darwaj<br />

a O/o<br />

Jeliben’<br />

s House,<br />

Bharuc<br />

h.<br />

Jami<br />

Masjid,<br />

Bharuc<br />

h<br />

Prohibit<br />

ed area<br />

a)<br />

64.0<br />

0 m<br />

b)<br />

64.0<br />

0 m<br />

Construction <strong>of</strong><br />

residential<br />

building<br />

Surrounding<br />

situation and<br />

approximate<br />

height <strong>of</strong> <strong>the</strong><br />

existing buildings<br />

near <strong>the</strong><br />

monument -<br />

North: Road &<br />

school building<br />

(GF+1), height<br />

upto 09.00 mts.<br />

South: Road &<br />

residential<br />

buildings<br />

(GF+1&2), height<br />

upto 12.00 mts.<br />

East: Road &<br />

residential<br />

building(GF+2)<br />

height upto 10.00<br />

mts.<br />

West: Road &<br />

residential<br />

12<br />

Open Plot The<br />

proposed<br />

land was<br />

allotted to<br />

<strong>the</strong><br />

applicant<br />

by <strong>the</strong><br />

Government<br />

being a<br />

poor<br />

person and<br />

having no<br />

land to<br />

reside.<br />

however, desired that<br />

<strong>the</strong> Ahmedabad<br />

Municipal Corporation<br />

may be asked to give a<br />

power-point<br />

presentation before <strong>the</strong><br />

Committee in <strong>the</strong> next<br />

<strong>meeting</strong> to take a final<br />

view. The decision on<br />

<strong>the</strong> proposal was<br />

deferred.<br />

- SA, Vadodara Circle<br />

gave a fresh powerpoint<br />

presentation on<br />

<strong>the</strong> proposal with <strong>the</strong><br />

help <strong>of</strong> area map,<br />

photographs <strong>of</strong> <strong>the</strong><br />

monument, site <strong>of</strong><br />

construction and<br />

buildings existing at <strong>the</strong><br />

site, Google Earth<br />

image and also <strong>the</strong><br />

details <strong>of</strong> height <strong>of</strong><br />

buildings existing<br />

between <strong>the</strong> monument<br />

and site <strong>of</strong> construction.<br />

The Committee<br />

observed that <strong>the</strong> area<br />

around <strong>the</strong> monument is<br />

dotted with modern<br />

buildings and<br />

construction as<br />

proposed at <strong>the</strong> site

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!