Minutes of the 19th meeting - Archaeological Survey of India
Minutes of the 19th meeting - Archaeological Survey of India
Minutes of the 19th meeting - Archaeological Survey of India
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ment<br />
(Housin<br />
g<br />
project)<br />
Ahmeda<br />
bad<br />
Municip<br />
al<br />
Corpor<br />
ation,<br />
FF<br />
Childre<br />
n<br />
Hospital<br />
Bu9ildi<br />
ng,<br />
Mithak<br />
hali,<br />
Ahmeda<br />
bad.<br />
7. CS<br />
No.4059<br />
ward<br />
No.4,<br />
Bharuch<br />
Shri<br />
Ismile<br />
Suleman<br />
i<br />
Multani,<br />
Bharuch<br />
Jami<br />
Masjid,<br />
Bharuc<br />
h<br />
Prohibit<br />
ed Area<br />
area Committee that <strong>the</strong><br />
Ahmedabad Municipal<br />
Committee is insisting<br />
that <strong>the</strong> Director<br />
General had accorded<br />
permission for<br />
undertaking<br />
construction on <strong>the</strong><br />
same property in 2006<br />
and as such permission<br />
for fur<strong>the</strong>r construction<br />
may be accorded by <strong>the</strong><br />
ASI. The Committee<br />
desired that records in<br />
<strong>the</strong> Directorate General<br />
may be checked to<br />
ascertain <strong>the</strong> nature <strong>of</strong><br />
permission given. The<br />
Committee deferred <strong>the</strong><br />
a)10.<br />
00 m<br />
b)10.<br />
00 m<br />
Reconstruction<br />
<strong>of</strong> residential<br />
building<br />
Road exists<br />
between <strong>the</strong><br />
monument and<br />
proposed site<br />
8<br />
Old existing<br />
building<br />
(GF+2) was<br />
<strong>of</strong> <strong>the</strong> height<br />
9.00 m. The<br />
old existing<br />
building was<br />
in dilapidated<br />
condition and<br />
badly<br />
damaged.<br />
The Chief<br />
Office,<br />
Bharuch<br />
The old<br />
building<br />
was in<br />
dilapidated<br />
condition<br />
& needs to<br />
be<br />
reconstruct<br />
-ted.<br />
matter.<br />
- Although a fresh<br />
power-point<br />
presentation was given<br />
by SA, Vadodara Circle<br />
explaining <strong>the</strong> ground<br />
conditions, <strong>the</strong><br />
Committee desired that<br />
<strong>the</strong> details <strong>of</strong> <strong>the</strong> earlier<br />
construction existing at<br />
<strong>the</strong> site should have<br />
been collected by <strong>the</strong><br />
SA. It was also<br />
suggested that more<br />
photographs, proper