Minutes of the 19th meeting - Archaeological Survey of India
Minutes of the 19th meeting - Archaeological Survey of India
Minutes of the 19th meeting - Archaeological Survey of India
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Co.,Dad<br />
ar (E),<br />
Mumba<br />
i<br />
19. C.S.<br />
No.141,<br />
Shaniw<br />
ar Peth,<br />
Pune<br />
within<br />
restricte<br />
d area<br />
from<br />
Shaniw<br />
ar<br />
Wada,<br />
Pune in<br />
favour<br />
<strong>of</strong> Shri<br />
Sumant<br />
Dattatr<br />
aya<br />
to Ground + 6<br />
floors.<br />
c) There is a road<br />
in front <strong>of</strong> <strong>the</strong><br />
site.<br />
22<br />
School can<br />
not be met<br />
with<br />
Ground + 2<br />
bldg. The<br />
building is<br />
required to<br />
be<br />
constructed<br />
having<br />
Ground +5<br />
floors with<br />
22.65 mts<br />
height with<br />
basement<br />
for parking.<br />
-- -- -- -- -- -- -- SA, Mumbai<br />
Circle has<br />
informed that <strong>the</strong><br />
applicant has not<br />
submitted <strong>the</strong><br />
required<br />
documents so far.<br />
A request is being<br />
made to him<br />
accordingly.<br />
SA, Mumbai Circle<br />
informed that <strong>the</strong><br />
applicant has not<br />
submitted <strong>the</strong> required<br />
documents so far. A<br />
request is being made to<br />
him accordingly.<br />
In absence <strong>of</strong> details,<br />
<strong>the</strong> matter was deferred.