01.08.2013 Views

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Co.,Dad<br />

ar (E),<br />

Mumba<br />

i<br />

19. C.S.<br />

No.141,<br />

Shaniw<br />

ar Peth,<br />

Pune<br />

within<br />

restricte<br />

d area<br />

from<br />

Shaniw<br />

ar<br />

Wada,<br />

Pune in<br />

favour<br />

<strong>of</strong> Shri<br />

Sumant<br />

Dattatr<br />

aya<br />

to Ground + 6<br />

floors.<br />

c) There is a road<br />

in front <strong>of</strong> <strong>the</strong><br />

site.<br />

22<br />

School can<br />

not be met<br />

with<br />

Ground + 2<br />

bldg. The<br />

building is<br />

required to<br />

be<br />

constructed<br />

having<br />

Ground +5<br />

floors with<br />

22.65 mts<br />

height with<br />

basement<br />

for parking.<br />

-- -- -- -- -- -- -- SA, Mumbai<br />

Circle has<br />

informed that <strong>the</strong><br />

applicant has not<br />

submitted <strong>the</strong><br />

required<br />

documents so far.<br />

A request is being<br />

made to him<br />

accordingly.<br />

SA, Mumbai Circle<br />

informed that <strong>the</strong><br />

applicant has not<br />

submitted <strong>the</strong> required<br />

documents so far. A<br />

request is being made to<br />

him accordingly.<br />

In absence <strong>of</strong> details,<br />

<strong>the</strong> matter was deferred.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!