01.08.2013 Views

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

Minutes of the 19th meeting - Archaeological Survey of India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

husban<br />

d <strong>of</strong><br />

Smt.<br />

Premila<br />

ben<br />

Ramnik<br />

lal<br />

Thaker<br />

2. CS<br />

No.869<br />

to 873,<br />

875 &<br />

876,<br />

Tika<br />

No.2,<br />

Shri<br />

Abdulk<br />

arim<br />

Rsulbha<br />

i<br />

Ghanch<br />

i & Shri<br />

Abdulk<br />

arim<br />

Beholol<br />

Khan’s<br />

Gazi’s<br />

Mosqu<br />

e,<br />

Dholka,<br />

Dist.,<br />

Ahmed<br />

abad<br />

Prohibit<br />

ed area<br />

a)<br />

adjac<br />

ent<br />

to<br />

<strong>the</strong><br />

prote<br />

cted<br />

area<br />

b)<br />

8.00<br />

m<br />

Reconstruction<br />

<strong>of</strong> primary<br />

school building<br />

Proposed site is<br />

surrounded by a<br />

school building,<br />

commercial and<br />

residential<br />

buildings with<br />

height ranging<br />

from 3 to 6 m<br />

3<br />

Dwarka has<br />

issued a letter<br />

dated<br />

28.11.07 to<br />

<strong>the</strong> applicant<br />

for repairs <strong>of</strong><br />

existing<br />

building and<br />

has also<br />

informed <strong>the</strong><br />

applicant that<br />

in case <strong>of</strong><br />

reconstruct<br />

tion <strong>of</strong><br />

building, he<br />

may also<br />

obtain NOC<br />

from ASI.<br />

The proposed<br />

reconstructio<br />

n site exists<br />

in CS No.876<br />

(Part) with<br />

<strong>the</strong> max.<br />

height <strong>of</strong><br />

6.00 m.<br />

O<strong>the</strong>r<br />

buildings<br />

have been<br />

demolished<br />

by <strong>the</strong><br />

applicant.<br />

on is<br />

necessary.<br />

The<br />

existing<br />

building<br />

has been<br />

demolished<br />

by <strong>the</strong><br />

applicant.<br />

The existing<br />

building has been<br />

demolished by <strong>the</strong><br />

applicant. SA,<br />

Vadodara Circle<br />

has rejected <strong>the</strong><br />

request <strong>of</strong> <strong>the</strong><br />

applicant.<br />

reconstruction in <strong>the</strong><br />

prohibited area <strong>of</strong> <strong>the</strong><br />

monument.<br />

The Committee was <strong>of</strong><br />

<strong>the</strong> opinion that <strong>the</strong><br />

distance between <strong>the</strong><br />

monument and <strong>the</strong> site<br />

<strong>of</strong> reconstruction is just<br />

1 m. Moreover, <strong>the</strong><br />

existing building does<br />

not appear to be in<br />

dilapidated condition<br />

and hence it was<br />

recommended that <strong>the</strong><br />

proposal may be<br />

rejected by <strong>the</strong> ASI.<br />

SA, Vadodara Circle<br />

gave a power-point<br />

presentation with <strong>the</strong><br />

help <strong>of</strong> photographs,<br />

drawings and area map.<br />

The Committee was not<br />

satisfied with <strong>the</strong> home<br />

work done by <strong>the</strong> Circle<br />

as with <strong>the</strong> data made<br />

available it is not<br />

possible to evaluate <strong>the</strong><br />

ground conditions. It<br />

was also observed that<br />

<strong>the</strong> Circle should have<br />

collected <strong>the</strong> details <strong>of</strong><br />

<strong>the</strong> building which

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!