Brief Description of Project<br />
Supply, installation & commissioning of a Gas Monitoring System (“GMS”) for<br />
the remote monitoring of pipeline networks transporting natural gas into various<br />
power stations in Singapore.<br />
Maintenance of Telemetry Monitoring Systems (“TMS”) for a period of five (5)<br />
years consisting preventive and corrective maintenance of 2,500 Lift Monitoring<br />
Devices located all over the Singapore Island.<br />
Supply, installation and commissioning of Intrusion Detection Systems (“IDS”)<br />
capable of detecting unauthorized entry into power distribution substations at<br />
1,000 substations.<br />
Provision for the maintenance of 83 Remote Terminal Units (“RTUs”) installed<br />
at transmission substations on a 6-monthly preventive maintenance and ad-hoc<br />
corrective maintenance basis.<br />
Supply, installation & commissioning of 2,400 Lift Mornitoring Devices (“LMD”)<br />
and 10 Area Receiving Stations (“ARS”) under the Lift Upgrade Program<br />
(“LUP”).<br />
Supply, installation & commissioning of Integrated, Security and Operation<br />
Surveillance System (“ISOSS”) consisting Building Access Control Systems<br />
(“BACS”), CCTV Systems, Fence Intrusion Detection Systems (“FIDS”) and<br />
Public Announcement (“PA”) Systems at thirty (30) 66KV substations.<br />
Supply, installation & commissioning of 650 Lift Surveillance Systems (“LSS”)<br />
and 70 Lift Lobby Systems (“LLS”) under the LUP.<br />
Supply, installation & commissioning of Building Monitorign Centre (“BMC”) for<br />
the monitoring of TMS and Photovoltaic Monitoring Systems for public housing<br />
in Singapore.<br />
Supply, installation & commissioning of the Partial Discharge Monitoring<br />
(“PDM”) Systems consisting Ultra High Frequency (“UHF”) sensors, Data<br />
Acquisition Units and Micro-controller Base Units at four (4) 66KV substations.<br />
Supply, installation & commissioning of RTUs and Modbus Servers at six (6)<br />
Gas Offtake and Metering Stations.<br />
Maintenance of PDM Systems at five (5) 400KV and 230KV substations for a<br />
period of twenty-four (24) months comprising quarterly preventive and ad-hoc<br />
corrective maintenance.<br />
92<br />
Value<br />
(RM’000)<br />
6,918<br />
3,302<br />
3,285<br />
1,947<br />
14,386<br />
11,130<br />
3,717<br />
2,020<br />
1,952<br />
1,849<br />
1,007<br />
Meanwhile, the revenue contribution from the Europe market has increased by<br />
RM1.25 million to RM2.02 million in the FYE 31 December 2008 as compared to<br />
RM771,000 recorded in the previous financial year. As it is a normal occurrence in<br />
the SCADA industry that clients will need to upgrade their control system to fulfill the<br />
requirement of their respective industries, many of the Group’s existing clients have<br />
initiated upgrading works on their existing control system. In the FYE 31 December<br />
2008, one of the clients in Europe has initiated an upgrade of their existing SCADA<br />
system contributing to an increase to the Group’s revenue from Europe.<br />
Revenue for the Willowglen Group increased further by RM10.844 million or 21.20%<br />
from RM51.16 million to RM62.001 million in the FYE 31 December 2009. The<br />
increase in revenue was mainly due to the increase in the number of long term<br />
projects secured by our Group during the FYE 31 December 2009. The number of<br />
contracts secured by the Willowglen Group had increased to 134 projects as<br />
compared to 106 projects secured in the previous financial year. There were 60 new