Company No. 462648-V<br />
6. BUSINESS OVERVIEW (CONT’D)<br />
Hardware Development<br />
With the information gathered from the bid or other hardware development cross<br />
reference, we develop a Hardware Module Functional Specification Document which<br />
serves to define the objective of the development project. We then estimate the<br />
hardware development timeframe and subsequently prepare the hardware<br />
development schedule taking into consideration costing as well as Human Resource<br />
Planning for the project.<br />
The execution of the project will begin with the ordering of parts and components and<br />
the design and drawing of the schematics and modification of the design according to<br />
the parts and components available. The firmware is developed concurrently to<br />
support the hardware as well as to enable to communication between modules in the<br />
hardware designed. Once a satisfactory design is obtained, a prototype PCB testing<br />
is carried out to ensure that the product is functioning properly and test results will be<br />
kept on a prototype test record for review and future reference. Once the prototype is<br />
finalised for production, a manual for the product will be prepared for the final product<br />
release after the prototype finalisation and approval of the product are completed.<br />
This process is depicted below:<br />
HardwareDesign<br />
Schematic<br />
PCBDesign<br />
Components<br />
Purchasing<br />
Functional<br />
S pecification<br />
Document<br />
Establish<br />
DevelopmentPlan&<br />
Schedule<br />
Partsearch&order.<br />
Breadboardconcept<br />
andcomponents<br />
PrototypePCB<br />
Assembly<br />
PrototypePCB<br />
Testing<br />
PrototypeFinalisation<br />
andApproval<br />
ManualPreparation&<br />
Review<br />
FirmwareDesign<br />
PCBFabrication<br />
30<br />
ProductRelease<br />
PrototypeTestRecord<br />
End