The eligibility criteria for inclusion <strong>of</strong> a SSC-CPA under the SSC-PoA are as follows:<br />

S. No Eligibility Criteria Status<br />

1 The SSC-CPA promoter, BEE and the related DISCOM will enter into<br />

a tripartite agreement, specifying each party's duties and<br />

responsibilities under a SSC-CPA.<br />

2 SSC-CPA shall agree to continue providing monitoring as per the<br />

requirements and provision <strong>of</strong> the SSC-CPA-DD, after 31st March<br />

2012, when the BEE funded-monitoring stops.<br />

3 SSC-CPA <strong>CFL</strong>s distributed under the <strong>scheme</strong>:<br />

- be distributed to grid-connected households at Rs 10-15 (price <strong>of</strong><br />

an ICL).<br />

- Conform to the IS : 15111 requirements<br />

4 Safe disposal <strong>of</strong> a fused <strong>CFL</strong> shall comply with national regulations<br />

for environmentally safe handling and Management <strong>of</strong> mercury<br />

containing Fluorescent lamps, set by the <strong>Ministry</strong> <strong>of</strong> Environment and<br />

Forest, Govt <strong>of</strong> India.<br />

5 The SSC-CPA shall not re-register an existing <strong>CDM</strong> project or post-<br />

PoA registration shall not register SSC-CPA as a distinct <strong>CDM</strong> project<br />

outside the SSC-PoA.<br />

6 The individual SSC-CPAs shall be confirmed to not to be a de-bundled<br />

component <strong>of</strong> another large-scale CPA or <strong>CDM</strong> project activity as per<br />

the latest guidance given by the <strong>CDM</strong> EB10 . The non-occurrence <strong>of</strong><br />

de-bundling shall be justified in a SSC-CPA-DD for a SSC-CPA.<br />

7 The geographical boundary <strong>of</strong> the SSC-CPA area is uniquely mapped<br />

by SSC-CPA at its own cost e.g. using Geographical Information<br />

System (GIS) etc.<br />

10 At the time <strong>of</strong> submission <strong>of</strong> the SSC-PoA-DD for validation, the latest available <strong>CDM</strong> EB guidance is <strong>CDM</strong> EB 33 meeting report Annex 21<br />

“Guidance for determining the occurrence <strong>of</strong> de-bundling under a PoA”. It stipulates the following:<br />

For the purposes <strong>of</strong> registration <strong>of</strong> a PoA1 , a proposed SSC-CPA <strong>of</strong> a PoA shall be deemed to be a de-bundled component <strong>of</strong> a large scale activity<br />

if there is already an activity, 2 which:<br />

a. Has the same activity implementer as the proposed SSC-CPA or has a coordinating or managing entity, which also manages a large scale<br />

PoA <strong>of</strong> the same sectoral scope, and;<br />

b. The boundary is within 1 km <strong>of</strong> the boundary <strong>of</strong> the proposed SSC-CPA, at the closest point.<br />

1 Only those PoAs need to be considered in determining de-bundling that are: (i) in the same geographical area; and (ii) use the same<br />

methodology; as the PoA to which proposed CPA is being added.<br />

2 Which may be a (i) registered SSC-CPA <strong>of</strong> a PoA, (ii) an application to register another SSC-CPA <strong>of</strong> a PoA, or (iii) another registered<br />

<strong>CDM</strong> project activity.<br />

18 Bureau <strong>of</strong> Energy Efficiency<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No<br />

Yes<br />

No

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!