04.08.2013 Views

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Data / Parameter: oi<br />

Data unit: Hours<br />

Description: Average annual operating hours <strong>of</strong> the devices <strong>of</strong> the group <strong>of</strong> "i" baseline ICLs<br />

Source <strong>of</strong> data used: SSC-CPA database / DISCOM<br />

Value applied: To be filled by SSC-CPA<br />

Justification <strong>of</strong> the The SSC-CPA will conduct an ex-ante baseline survey <strong>of</strong> the o i prior to <strong>CFL</strong><br />

choice <strong>of</strong> data or distribution. The data will be entered into the SSC-CPA database.<br />

description <strong>of</strong><br />

measurement methods<br />

and procedures<br />

actually applied :<br />

QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSCto<br />

be applied: CPA.<br />

Any comment: Data to be reported to BEE for review<br />

Data / Parameter: BP<br />

Data unit: Number<br />

Description: Baseline penetration factor, the penetration <strong>of</strong> <strong>CFL</strong> in the SSC-CPA area<br />

Source <strong>of</strong> data used: ex ante representative sample survey<br />

Value applied: To be filled by SSC-CPA<br />

Justification <strong>of</strong> the The SSC-CPA shall conduct an ex-ante random sample survey and preserve<br />

choice <strong>of</strong> data or the results.<br />

description <strong>of</strong><br />

measurement methods<br />

and procedures<br />

actually applied :<br />

QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSCto<br />

be applied: CPA.<br />

Any comment: Data to be reported to BEE for review<br />

E.7. Application <strong>of</strong> the monitoring methodology and description <strong>of</strong> the monitoring plan:<br />

D.7.1. Data and parameters to be monitored by each SSC-CPA:<br />

(Copy this table for each data and parameter)<br />

Data / Parameter:<br />

Data unit:<br />

Description:<br />

Source <strong>of</strong> data to be used:<br />

36 Bureau <strong>of</strong> Energy Efficiency

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!