CDM based CFL scheme - Ministry of Power
CDM based CFL scheme - Ministry of Power
CDM based CFL scheme - Ministry of Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Data / Parameter: oi<br />
Data unit: Hours<br />
Description: Average annual operating hours <strong>of</strong> the devices <strong>of</strong> the group <strong>of</strong> "i" baseline ICLs<br />
Source <strong>of</strong> data used: SSC-CPA database / DISCOM<br />
Value applied: To be filled by SSC-CPA<br />
Justification <strong>of</strong> the The SSC-CPA will conduct an ex-ante baseline survey <strong>of</strong> the o i prior to <strong>CFL</strong><br />
choice <strong>of</strong> data or distribution. The data will be entered into the SSC-CPA database.<br />
description <strong>of</strong><br />
measurement methods<br />
and procedures<br />
actually applied :<br />
QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSCto<br />
be applied: CPA.<br />
Any comment: Data to be reported to BEE for review<br />
Data / Parameter: BP<br />
Data unit: Number<br />
Description: Baseline penetration factor, the penetration <strong>of</strong> <strong>CFL</strong> in the SSC-CPA area<br />
Source <strong>of</strong> data used: ex ante representative sample survey<br />
Value applied: To be filled by SSC-CPA<br />
Justification <strong>of</strong> the The SSC-CPA shall conduct an ex-ante random sample survey and preserve<br />
choice <strong>of</strong> data or the results.<br />
description <strong>of</strong><br />
measurement methods<br />
and procedures<br />
actually applied :<br />
QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSCto<br />
be applied: CPA.<br />
Any comment: Data to be reported to BEE for review<br />
E.7. Application <strong>of</strong> the monitoring methodology and description <strong>of</strong> the monitoring plan:<br />
D.7.1. Data and parameters to be monitored by each SSC-CPA:<br />
(Copy this table for each data and parameter)<br />
Data / Parameter:<br />
Data unit:<br />
Description:<br />
Source <strong>of</strong> data to be used:<br />
36 Bureau <strong>of</strong> Energy Efficiency