04.08.2013 Views

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PSMG Setting Criteria<br />

1. The survey should cover the SSC-CPA area,<br />

covering the residential sector only,<br />

2. Random sample group be determined using<br />

statistical tools as representing the households<br />

falling under the SSC-CPA area.<br />

3. Survey sample size be determined to have atleast<br />

90% confidence level with 10 % margin <strong>of</strong> error 27 .<br />

4. Visit identified households and assess the<br />

following for each household:<br />

a. Is the installed <strong>CFL</strong> in operation : Yes / No<br />

b. If yes install the sensor for monitoring (give<br />

cross reference)<br />

The data will be collected and collated centrally by<br />

BEE nominated agency for the SSC-CPA.<br />

Establish the SSC-CPA database<br />

The SSC-CPA will establish a database where all<br />

relevant information will be entered. Such information<br />

includes, inter alia:<br />

Defined geographical area <strong>of</strong> the SSC-CPA e.g by<br />

means <strong>of</strong> Political maps, ground survey, GIS<br />

mapping etc<br />

For each household that receives <strong>CFL</strong>s:<br />

A list <strong>of</strong> each household that received <strong>CFL</strong>s<br />

(name, address, unique identification e.g.<br />

GIS co-ordinates etc, and applicable SSC-<br />

CPA area).<br />

For each corresponding light bulb:<br />

Information that allows for a clear identification<br />

<strong>of</strong> the replaced ICLs, distributed <strong>CFL</strong>s, and<br />

distributed <strong>CFL</strong>s that are broken (e.g. BEE logo,<br />

manufacturers label, serial number, etc.).<br />

Date <strong>of</strong> distribution <strong>of</strong> the <strong>CFL</strong>s.<br />

Number and nominal power ratings <strong>of</strong> the<br />

replaced ICLs and distributed <strong>CFL</strong>s.<br />

Date <strong>of</strong> return and scrap <strong>of</strong> the replaced ICLs<br />

Number <strong>of</strong> the scrapped ICLs.<br />

42 Bureau <strong>of</strong> Energy Efficiency<br />

Date <strong>of</strong> return and safe disposal <strong>of</strong> the distributed<br />

<strong>CFL</strong>s that are broken.<br />

Number <strong>of</strong> the collected broken <strong>CFL</strong>s safely<br />

disposed<br />

In addition to above, for each household in the<br />

PSMG:<br />

A list <strong>of</strong> each household in the PSMG (name,<br />

address, GPS location, and applicable SSC-<br />

CPA area).<br />

Information on when the household has<br />

been added to the PSMG and information<br />

on when it has been removed (if applicable).<br />

For each <strong>CFL</strong> point with the functioning<br />

monitoring equipment: 28<br />

Utilization hours <strong>of</strong> the <strong>CFL</strong>.<br />

Date <strong>of</strong> initial installation <strong>of</strong> the<br />

monitoring equipment and unique ID.<br />

Calibration <strong>of</strong> the Monitoring<br />

equipment<br />

Information on any changes made to<br />

the <strong>CFL</strong> / monitoring equipment<br />

(exchange, repair, removed and<br />

installed else-where etc).<br />

3. Cross-check group Monitoring<br />

27 Taken from AMS IIJ version 01<br />

28 It is BEE’s responsibility to provide the data under this clause to the <strong>CFL</strong> manufacturer /Trader /Trader (j).<br />

Spot Check data: Spot check is conducted at the<br />

time <strong>of</strong> the end <strong>of</strong> the project monitoring period<br />

(y) or atleast annually to cross-check the working<br />

condition <strong>of</strong> installed <strong>CFL</strong>s distributed at the time<br />

<strong>of</strong> project start:<br />

A list <strong>of</strong> each household included in the Spot<br />

Check (name, address, unique identification<br />

e.g. GIS co-ordinates etc, and applicable SSC-<br />

CPA area).<br />

Number <strong>of</strong> the distributed <strong>CFL</strong>s in operation<br />

at the time when the spot check on the<br />

household is conducted.<br />

Information that allows for a clear<br />

identification <strong>of</strong> the distributed <strong>CFL</strong>s (e.g.<br />

BEE logo, manufacturers label, serial<br />

number, etc.).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!