Justification <strong>of</strong> the The SSC-CPA owner supported by DISCOM (i) will monitor pi,<strong>CFL</strong> during<br />
choice <strong>of</strong> data or the each <strong>CFL</strong> use monitoring period. The data will be entered into the SSCdescription<br />
<strong>of</strong> CPA database.<br />
measurement methods In the case <strong>of</strong> both retr<strong>of</strong>it and new installations, "power" is the weighted<br />
and procedures average <strong>of</strong> the <strong>CFL</strong>s installed.<br />
actually applied :<br />
QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSC-CPA.<br />
to be applied:<br />
Any comment: Data to be reported to BEE for review<br />
Data / Parameter: EF CO2,ELEC,y<br />
Data unit: tCO 2 /kWh<br />
Description: CO 2 emission factor for displacement <strong>of</strong> electricity in the grid serving<br />
the household consumers that participate in the SSC-CPA during the<br />
monitoring interval y, calculated according to the latest approved version <strong>of</strong><br />
AMS-I.D (tCO 2 /kWh)<br />
Source <strong>of</strong> data used: The latest version <strong>of</strong> <strong>CDM</strong> baseline CO 2 emission database by Central<br />
Electricity Authority (CEA), India<br />
Value applied: SSC-CPA to apply as per the grid-connectivity<br />
Justification <strong>of</strong> the The SSC-CPA owner shall apply the latest grid emission factor database<br />
choice <strong>of</strong> data or available on the CEA website.<br />
description <strong>of</strong><br />
measurement methods<br />
and procedures<br />
actually applied :<br />
QA/QC procedures N/A<br />
to be applied:<br />
Any comment: Data to be reported to BEE for review<br />
E.7.2. Description <strong>of</strong> the monitoring plan for a SSC-<br />
CPA:<br />
>>The Monitoring for the SSC-CPA would be carried<br />
out at the following levels:<br />
1. Baseline Penetration Survey<br />
2. Continuous <strong>CFL</strong> Use Monitoring<br />
3. Cross-check group monitoring<br />
4. ICL/ fused <strong>CFL</strong> Scrapping survey<br />
5. Roles and Responsibilities<br />
6. Training and Calibration<br />
40 Bureau <strong>of</strong> Energy Efficiency<br />
The description <strong>of</strong> each <strong>of</strong> the levels is provided in the<br />
following pages.<br />
1. Baseline Penetration Survey<br />
Random Selection <strong>of</strong> households<br />
For any proposed SSC-CPA area, the responsible<br />
DISCOM, will generate a database listing all<br />
residential households eligible under the SSC-CPA.<br />
From this set <strong>of</strong> customers a sample household pool<br />
will be randomly selected for the baseline survey. to<br />
form the Baseline Sample Group (BSG). The BSG<br />
would be set as per following criteria: