04.08.2013 Views

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

CDM based CFL scheme - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Justification <strong>of</strong> the The SSC-CPA owner supported by DISCOM (i) will monitor pi,<strong>CFL</strong> during<br />

choice <strong>of</strong> data or the each <strong>CFL</strong> use monitoring period. The data will be entered into the SSCdescription<br />

<strong>of</strong> CPA database.<br />

measurement methods In the case <strong>of</strong> both retr<strong>of</strong>it and new installations, "power" is the weighted<br />

and procedures average <strong>of</strong> the <strong>CFL</strong>s installed.<br />

actually applied :<br />

QA/QC procedures Use <strong>of</strong> standardized data forms and compliance protocols <strong>of</strong> DISCOM/ SSC-CPA.<br />

to be applied:<br />

Any comment: Data to be reported to BEE for review<br />

Data / Parameter: EF CO2,ELEC,y<br />

Data unit: tCO 2 /kWh<br />

Description: CO 2 emission factor for displacement <strong>of</strong> electricity in the grid serving<br />

the household consumers that participate in the SSC-CPA during the<br />

monitoring interval y, calculated according to the latest approved version <strong>of</strong><br />

AMS-I.D (tCO 2 /kWh)<br />

Source <strong>of</strong> data used: The latest version <strong>of</strong> <strong>CDM</strong> baseline CO 2 emission database by Central<br />

Electricity Authority (CEA), India<br />

Value applied: SSC-CPA to apply as per the grid-connectivity<br />

Justification <strong>of</strong> the The SSC-CPA owner shall apply the latest grid emission factor database<br />

choice <strong>of</strong> data or available on the CEA website.<br />

description <strong>of</strong><br />

measurement methods<br />

and procedures<br />

actually applied :<br />

QA/QC procedures N/A<br />

to be applied:<br />

Any comment: Data to be reported to BEE for review<br />

E.7.2. Description <strong>of</strong> the monitoring plan for a SSC-<br />

CPA:<br />

>>The Monitoring for the SSC-CPA would be carried<br />

out at the following levels:<br />

1. Baseline Penetration Survey<br />

2. Continuous <strong>CFL</strong> Use Monitoring<br />

3. Cross-check group monitoring<br />

4. ICL/ fused <strong>CFL</strong> Scrapping survey<br />

5. Roles and Responsibilities<br />

6. Training and Calibration<br />

40 Bureau <strong>of</strong> Energy Efficiency<br />

The description <strong>of</strong> each <strong>of</strong> the levels is provided in the<br />

following pages.<br />

1. Baseline Penetration Survey<br />

Random Selection <strong>of</strong> households<br />

For any proposed SSC-CPA area, the responsible<br />

DISCOM, will generate a database listing all<br />

residential households eligible under the SSC-CPA.<br />

From this set <strong>of</strong> customers a sample household pool<br />

will be randomly selected for the baseline survey. to<br />

form the Baseline Sample Group (BSG). The BSG<br />

would be set as per following criteria: