2.20 POWER & TELECOMMUNI-<br />
CATION CO-ORDINATION<br />
(PTCC)<br />
During the year <strong>1991</strong>-<strong>92</strong>, CEA have recommended 74<br />
cases to DOT for issue <strong>of</strong> necessary clearance by them so<br />
that the transmission lines could be energised. CEA<br />
engineers were associated in the Low Frequency<br />
Induction tests carried out on Gooty-Banglaroe and<br />
Talaguppa-Shimaga 400 KV transmission lines. CEA<br />
have also provided consultancy services to Bihar State<br />
Electricity Board in processing on computer PTCC cases.<br />
During the year three meetings were organised at Delhi,<br />
Bangalore & Patna for sorting out outstanding issues<br />
related to PTCC clearance. These meetings were attended<br />
by higher level <strong>of</strong>ficers from CEA, DOT and SEBs/<strong>Power</strong><br />
Utilities.<br />
2.21 RURAL ELECTRIFICATION<br />
PROGRAMME<br />
During the year <strong>1991</strong>-<strong>92</strong>, 2022 inhabited villages were<br />
declared as electrified and 194482 pumpsets energised as<br />
on 30.11.<strong>1991</strong>, against the target <strong>of</strong> 5787 villages<br />
electrification and 234530 pumpsets energisation<br />
respectively, for the year as a whole. Cumulatively,<br />
483146 villages have been electrified and 91035<strong>92</strong><br />
pumpsets have been energised as on 30.11.<strong>1991</strong>.<br />
Cumulative progress <strong>of</strong> rural electrification both in terms<br />
<strong>of</strong> villages electrified and pumpsets energised as at the<br />
end <strong>of</strong> Five Year/Annual Plan is reflected in the charts at<br />
pages 18 & 19.<br />
As regards to the electrification <strong>of</strong> tribal villages, out <strong>of</strong> a<br />
total <strong>of</strong> 111886 tribal villages in the country, 73532<br />
villages constituting 65.7% have been electrified as on<br />
30.11.<strong>1991</strong>. Similarly, 245583 Harijan Bastis have been<br />
electrified.<br />
2.22 SEVENTH FIVE YEAR PALN<br />
The salient features <strong>of</strong> the approved <strong>power</strong> programme<br />
during the Seventh Plan (1985-90) were:<br />
a. Induction <strong>of</strong> an additional generating capacity <strong>of</strong><br />
22,245 MW as follows:-<br />
Thermal 15,999 MW<br />
Hydro 5,541 MW<br />
Nuclear 705 MW<br />
22,245 MW<br />
b. Construction <strong>of</strong> associated transmission and<br />
distribution facilities corresponding to the addition <strong>of</strong><br />
22,245 MW generating capacity.<br />
19<br />
c. Electrification <strong>of</strong> 1.18 lakh villages and energisation<br />
<strong>of</strong> 23.9 lakhs pump-sets.<br />
d. Implementation <strong>of</strong> programmes <strong>of</strong> renovation and<br />
modernisation, research and development, energy<br />
conservation etc.<br />
The achievement <strong>of</strong> the Seventh plan <strong>power</strong> programme<br />
has been impressive. An additional generating capacity <strong>of</strong><br />
21,401 MW comprising 17,104 MW <strong>of</strong> thermal, 3827<br />
MW <strong>of</strong> hydro and 470 MW nuclear, has been installed,<br />
achievement being 96.2% <strong>of</strong> the target <strong>of</strong> the Seventh<br />
Plan. A 250 MW back-to-back HVDC line has been<br />
established at Vindhyachal. About 13,800 Ckt. Kms <strong>of</strong><br />
400 KV and 13600 Ckt Kms <strong>of</strong> 220 KV lines have been<br />
added to the transmission and distribution network in the<br />
country. Electrification <strong>of</strong> 100494 villages and<br />
energisation <strong>of</strong> 26.41 lakhs <strong>of</strong> pumpsets was completed in<br />
the Seventh Plan.<br />
A total allocation <strong>of</strong> Rs. 34273.<strong>92</strong> crores was made in the<br />
seventh plan for the <strong>power</strong> sector against which the<br />
expenditure was Rs. 37404.19 crores (tentative), the<br />
details <strong>of</strong> which are given below :-<br />
(Rs. in crores)<br />
Approved outlay Actual Expenditure<br />
(Anticipated)<br />
States 22784.18 20757.04<br />
UTs 437.74 <strong>92</strong>9.15<br />
Centre 11052.00 15718.00*<br />
34273.<strong>92</strong> 37404.19<br />
(This includes Rs. 430.00 crores for PFC also)<br />
2.23 PROGRAMME FOR ADDITIONS<br />
TO GENERATING CAPACITY<br />
DURING 1990-91:<br />
A target <strong>of</strong> 4212 MW was fixed for addition <strong>of</strong> installed<br />
generating capacity during the year 1990-91. The details<br />
are given below :<br />
(All Figures in MW)<br />
Type Central State Total<br />
Sector Sector All India<br />
Hydro – 1006.5 1006.5<br />
Thermal 732 2238.5 2970.5<br />
Nuclear 235 – 235.0<br />
Total: 967 3245.0 4212.0