2.20 POWER & TELECOMMUNI-<br />

CATION CO-ORDINATION<br />

(PTCC)<br />

During the year <strong>1991</strong>-<strong>92</strong>, CEA have recommended 74<br />

cases to DOT for issue <strong>of</strong> necessary clearance by them so<br />

that the transmission lines could be energised. CEA<br />

engineers were associated in the Low Frequency<br />

Induction tests carried out on Gooty-Banglaroe and<br />

Talaguppa-Shimaga 400 KV transmission lines. CEA<br />

have also provided consultancy services to Bihar State<br />

Electricity Board in processing on computer PTCC cases.<br />

During the year three meetings were organised at Delhi,<br />

Bangalore & Patna for sorting out outstanding issues<br />

related to PTCC clearance. These meetings were attended<br />

by higher level <strong>of</strong>ficers from CEA, DOT and SEBs/<strong>Power</strong><br />

Utilities.<br />

2.21 RURAL ELECTRIFICATION<br />

PROGRAMME<br />

During the year <strong>1991</strong>-<strong>92</strong>, 2022 inhabited villages were<br />

declared as electrified and 194482 pumpsets energised as<br />

on 30.11.<strong>1991</strong>, against the target <strong>of</strong> 5787 villages<br />

electrification and 234530 pumpsets energisation<br />

respectively, for the year as a whole. Cumulatively,<br />

483146 villages have been electrified and 91035<strong>92</strong><br />

pumpsets have been energised as on 30.11.<strong>1991</strong>.<br />

Cumulative progress <strong>of</strong> rural electrification both in terms<br />

<strong>of</strong> villages electrified and pumpsets energised as at the<br />

end <strong>of</strong> Five Year/Annual Plan is reflected in the charts at<br />

pages 18 & 19.<br />

As regards to the electrification <strong>of</strong> tribal villages, out <strong>of</strong> a<br />

total <strong>of</strong> 111886 tribal villages in the country, 73532<br />

villages constituting 65.7% have been electrified as on<br />

30.11.<strong>1991</strong>. Similarly, 245583 Harijan Bastis have been<br />

electrified.<br />

2.22 SEVENTH FIVE YEAR PALN<br />

The salient features <strong>of</strong> the approved <strong>power</strong> programme<br />

during the Seventh Plan (1985-90) were:<br />

a. Induction <strong>of</strong> an additional generating capacity <strong>of</strong><br />

22,245 MW as follows:-<br />

Thermal 15,999 MW<br />

Hydro 5,541 MW<br />

Nuclear 705 MW<br />

22,245 MW<br />

b. Construction <strong>of</strong> associated transmission and<br />

distribution facilities corresponding to the addition <strong>of</strong><br />

22,245 MW generating capacity.<br />

19<br />

c. Electrification <strong>of</strong> 1.18 lakh villages and energisation<br />

<strong>of</strong> 23.9 lakhs pump-sets.<br />

d. Implementation <strong>of</strong> programmes <strong>of</strong> renovation and<br />

modernisation, research and development, energy<br />

conservation etc.<br />

The achievement <strong>of</strong> the Seventh plan <strong>power</strong> programme<br />

has been impressive. An additional generating capacity <strong>of</strong><br />

21,401 MW comprising 17,104 MW <strong>of</strong> thermal, 3827<br />

MW <strong>of</strong> hydro and 470 MW nuclear, has been installed,<br />

achievement being 96.2% <strong>of</strong> the target <strong>of</strong> the Seventh<br />

Plan. A 250 MW back-to-back HVDC line has been<br />

established at Vindhyachal. About 13,800 Ckt. Kms <strong>of</strong><br />

400 KV and 13600 Ckt Kms <strong>of</strong> 220 KV lines have been<br />

added to the transmission and distribution network in the<br />

country. Electrification <strong>of</strong> 100494 villages and<br />

energisation <strong>of</strong> 26.41 lakhs <strong>of</strong> pumpsets was completed in<br />

the Seventh Plan.<br />

A total allocation <strong>of</strong> Rs. 34273.<strong>92</strong> crores was made in the<br />

seventh plan for the <strong>power</strong> sector against which the<br />

expenditure was Rs. 37404.19 crores (tentative), the<br />

details <strong>of</strong> which are given below :-<br />

(Rs. in crores)<br />

Approved outlay Actual Expenditure<br />

(Anticipated)<br />

States 22784.18 20757.04<br />

UTs 437.74 <strong>92</strong>9.15<br />

Centre 11052.00 15718.00*<br />

34273.<strong>92</strong> 37404.19<br />

(This includes Rs. 430.00 crores for PFC also)<br />

2.23 PROGRAMME FOR ADDITIONS<br />

TO GENERATING CAPACITY<br />

DURING 1990-91:<br />

A target <strong>of</strong> 4212 MW was fixed for addition <strong>of</strong> installed<br />

generating capacity during the year 1990-91. The details<br />

are given below :<br />

(All Figures in MW)<br />

Type Central State Total<br />

Sector Sector All India<br />

Hydro – 1006.5 1006.5<br />

Thermal 732 2238.5 2970.5<br />

Nuclear 235 – 235.0<br />

Total: 967 3245.0 4212.0