6.0 PUBLIC SECTOR UNDERTAKINGS & OTHER<br />
ORGANISATIONS<br />
6.1 NATIONAL THERMAL POWER<br />
CORPORATION LTD (NTPC).<br />
The NTPC is presently engaged in the execution <strong>of</strong> nine<br />
Super Thermal <strong>Power</strong> Project with an aggregate approved<br />
capacity <strong>of</strong> 13240 MW and four gas based combined<br />
cycle projects with an aggregate approved capacity <strong>of</strong><br />
2527 MW. The NTPC has also undertaken the<br />
construction <strong>of</strong> transmission lines with a total length<br />
<strong>of</strong> about 20200 ckt.kms. <strong>of</strong> high voltage lines including<br />
about 813 ckt. kms. <strong>of</strong> HVDC transmission line and 85<br />
sub-stations/sub-station extensions. The total approved<br />
cost <strong>of</strong> the NTPC projects including associated<br />
transmission system and other schemes is Rs. 18624.12<br />
crores. The above includes Rs. 103.5 crores for<br />
Vindhyachal-II.<br />
6.2 Projects under Implementation<br />
The details <strong>of</strong> the projects <strong>of</strong> the NTPC under<br />
implementation are given below :<br />
DETAILS OF NTPC PROJECTS<br />
Name <strong>of</strong> the Region/State Capacity in MW Actual/Expected Approved Cost<br />
Project date <strong>of</strong> incl. associated TL<br />
Ultimate Approved commissioning System<br />
(Rs. in Crs.)<br />
Singrauli STPP Northern 2000 2000 1374.93<br />
Uttar Pradesh Stage-I Unit-1(200) Feb.82<br />
(3x200) Unit-2(200) Nov. 82<br />
Unit-3(200) Mar. 83<br />
Stage-II Unit-4(200) Nov. 83<br />
(2x200+2x500) Unit-5(200) Feb. 84<br />
Unit-6(500) Dec. 86<br />
Unit-7(500) Nov. 87<br />
Korba STPP Western 2100 2100 1873.79<br />
Madhya Stage-I Unit-1(200) Mar. 83<br />
Pradesh (3x200+1x500) Unit-2(200) Oct.83<br />
Unit-3(200) Mar. 84<br />
Unit-4(500) May. 87<br />
Stage-II Unit-5(500) Mar. 88<br />
(2x500) Unit-6(500) Mar. 89<br />
Ramagundam STPP Southern 2100 2100 1985.12<br />
Andhra Stage-I Unit-1(200) Oct. 83<br />
Pradesh (3x200+1x500) Unit-2(200) May. 84<br />
Unit-3(200) Dec. 84<br />
Unit-4(500) Jun. 88<br />
Stage-II Unit-5(500) Mar. 89<br />
(2x500) Unit-6(500) Oct. 89<br />
Farakka STPP Eastern 2100 2100 2366.69<br />
West Bengal Stage-I Unit-1(200) Jan. 86<br />
(3x200) Unit-2(200) Dec. 86<br />
Unit-3(200) Aug. 87<br />
Stage-II Unit-4(500) Jun. <strong>92</strong><br />
(2x 500) Unit-5(500) Jun. 93<br />
Stage-III (1x500) Unit-6(500)#<br />