Kol Dam Hydro-Electric Project<br />

(I.C. = 800 MW)<br />

The Kol Dam Hydro-Electric Project which is located on<br />

Satluj river in Bilaspur district <strong>of</strong> Himachal Pradesh<br />

envisages utilisation <strong>of</strong> a drop about 140 mtrs. by<br />

constructing a 163 mt. high rockfill Dam and a <strong>Power</strong><br />

Station, with an installed capacity <strong>of</strong> 800 MW, at the toe<br />

<strong>of</strong> Dam. It is expected to provide an <strong>annual</strong> energy<br />

generation <strong>of</strong> 3089 million units in a 90% dependable<br />

year. The Project is estimated to cost Rs. 1354 crores at<br />

December, 90 price level, with a generation cost <strong>of</strong> 74.06<br />

Paise/unit.<br />

The Project is proposed to be completed in a period <strong>of</strong><br />

61 / years including 1 2 1 / years for infrastructural<br />

2<br />

development. M/s. Technopromexport, USSR has already<br />

submitted their Final Appraisal Report <strong>of</strong> the Kol Dam<br />

Project indicating its technical feasibility. Financial<br />

proposal <strong>of</strong> USSR's participation in execution <strong>of</strong> the<br />

project is awaited. The Project has been approved by PIB<br />

in July, <strong>1991</strong> and the approval <strong>of</strong> CCEA is under active<br />

consideration.<br />

6.29 DAMODAR VALLEY<br />

CORPORAITON<br />

The Damodar Valley Corporation was established in July,<br />

1948 under the Damodar Valley Corporation Act. The<br />

Corporation has a fulltime chairman and two part-time<br />

members. The part-time Members represent the States <strong>of</strong><br />

Bihar and West Bengal.<br />

The Functions <strong>of</strong> the Corporation include :<br />

• the promotion and operation <strong>of</strong> schemes for irrigation,<br />

water supply and drainage;<br />

• the promotion and operation <strong>of</strong> schemes for the<br />

generation, transmission and distribution <strong>of</strong> energy,<br />

both hydro-electric and thermal;<br />

• the promotion and operation <strong>of</strong> schemes for flood<br />

control in the Damodar river and its tributaries and the<br />

channels excavated by the Corporation for the<br />

improvement <strong>of</strong> flow conditions in the Hooghly river;<br />

• the promotion and control <strong>of</strong> Navigation in the<br />

Damodar river and its tributaries and channels, if any;<br />

• the promotion <strong>of</strong> afforestation and control <strong>of</strong> soil<br />

erosion in the Damodar Valley; and<br />

• the promotion <strong>of</strong> public health and the agricultural,<br />

industrial, economic and general well-being in the<br />

Damodar Valley and its areas <strong>of</strong> operation.<br />

47<br />

The Corporation has so far constructed four multi-purpose<br />

dams at Tilaiya, Konar, Maithon and Panchet. The<br />

irrigation system comprises a barrage over river Damodar<br />

at Durgapur and the canal system <strong>of</strong> 2495 Kms which<br />

includes 137 kms long irrigation-cum-navigation canal on<br />

the left bank <strong>of</strong> the river Damodar. The management <strong>of</strong><br />

irrigation system excluding the navigation canal was<br />

transferred to the Government <strong>of</strong> West Bengal in 1964.<br />

The installed capacity (derated) and geneation <strong>of</strong> <strong>power</strong><br />

during the year <strong>1991</strong>-<strong>92</strong> upto November, <strong>1991</strong>, are as<br />

follow :-<br />

Name <strong>of</strong> Installed capcity Generation MU upto<br />

Station (MW) 30th November, <strong>1991</strong>.<br />

1) Bokaro 3x50 - 150<br />

1x40 - 40<br />

190 363.77<br />

2) Bokaro 'B' 1x210 210 662.22<br />

3) C.T.P.S. 3x14 - 420<br />

3x120 - 360<br />

780 1173.89<br />

4) D.T.P.S. 1x140 - 140<br />

1x210 - 210<br />

350 717.01<br />

3268.89<br />

Gas Turbine 3x27.5 - 82.5<br />

at Maithon<br />

Hydel<br />

82.5 40.00<br />

Tilaiya 2x2 4 10.99<br />

Panchet 1x40 40 164.24<br />

Maithon 3x20 60 136.<strong>92</strong><br />

312.15<br />

Total Generation : 3621.04<br />

• BTPS 'A' Unit 4 derated to 40 MW from Janaury, 1990.<br />

•• Panchet unit 2 synchronised on 5.3.91 and generated<br />

80.46 MU upto 30.11.91.<br />

The position relating to the on-going generation and<br />

transmission projects <strong>of</strong> the Corporation is given in the<br />

table on the following page.