Kol Dam Hydro-Electric Project<br />
(I.C. = 800 MW)<br />
The Kol Dam Hydro-Electric Project which is located on<br />
Satluj river in Bilaspur district <strong>of</strong> Himachal Pradesh<br />
envisages utilisation <strong>of</strong> a drop about 140 mtrs. by<br />
constructing a 163 mt. high rockfill Dam and a <strong>Power</strong><br />
Station, with an installed capacity <strong>of</strong> 800 MW, at the toe<br />
<strong>of</strong> Dam. It is expected to provide an <strong>annual</strong> energy<br />
generation <strong>of</strong> 3089 million units in a 90% dependable<br />
year. The Project is estimated to cost Rs. 1354 crores at<br />
December, 90 price level, with a generation cost <strong>of</strong> 74.06<br />
Paise/unit.<br />
The Project is proposed to be completed in a period <strong>of</strong><br />
61 / years including 1 2 1 / years for infrastructural<br />
2<br />
development. M/s. Technopromexport, USSR has already<br />
submitted their Final Appraisal Report <strong>of</strong> the Kol Dam<br />
Project indicating its technical feasibility. Financial<br />
proposal <strong>of</strong> USSR's participation in execution <strong>of</strong> the<br />
project is awaited. The Project has been approved by PIB<br />
in July, <strong>1991</strong> and the approval <strong>of</strong> CCEA is under active<br />
consideration.<br />
6.29 DAMODAR VALLEY<br />
CORPORAITON<br />
The Damodar Valley Corporation was established in July,<br />
1948 under the Damodar Valley Corporation Act. The<br />
Corporation has a fulltime chairman and two part-time<br />
members. The part-time Members represent the States <strong>of</strong><br />
Bihar and West Bengal.<br />
The Functions <strong>of</strong> the Corporation include :<br />
• the promotion and operation <strong>of</strong> schemes for irrigation,<br />
water supply and drainage;<br />
• the promotion and operation <strong>of</strong> schemes for the<br />
generation, transmission and distribution <strong>of</strong> energy,<br />
both hydro-electric and thermal;<br />
• the promotion and operation <strong>of</strong> schemes for flood<br />
control in the Damodar river and its tributaries and the<br />
channels excavated by the Corporation for the<br />
improvement <strong>of</strong> flow conditions in the Hooghly river;<br />
• the promotion and control <strong>of</strong> Navigation in the<br />
Damodar river and its tributaries and channels, if any;<br />
• the promotion <strong>of</strong> afforestation and control <strong>of</strong> soil<br />
erosion in the Damodar Valley; and<br />
• the promotion <strong>of</strong> public health and the agricultural,<br />
industrial, economic and general well-being in the<br />
Damodar Valley and its areas <strong>of</strong> operation.<br />
47<br />
The Corporation has so far constructed four multi-purpose<br />
dams at Tilaiya, Konar, Maithon and Panchet. The<br />
irrigation system comprises a barrage over river Damodar<br />
at Durgapur and the canal system <strong>of</strong> 2495 Kms which<br />
includes 137 kms long irrigation-cum-navigation canal on<br />
the left bank <strong>of</strong> the river Damodar. The management <strong>of</strong><br />
irrigation system excluding the navigation canal was<br />
transferred to the Government <strong>of</strong> West Bengal in 1964.<br />
The installed capacity (derated) and geneation <strong>of</strong> <strong>power</strong><br />
during the year <strong>1991</strong>-<strong>92</strong> upto November, <strong>1991</strong>, are as<br />
follow :-<br />
Name <strong>of</strong> Installed capcity Generation MU upto<br />
Station (MW) 30th November, <strong>1991</strong>.<br />
1) Bokaro 3x50 - 150<br />
1x40 - 40<br />
190 363.77<br />
2) Bokaro 'B' 1x210 210 662.22<br />
3) C.T.P.S. 3x14 - 420<br />
3x120 - 360<br />
780 1173.89<br />
4) D.T.P.S. 1x140 - 140<br />
1x210 - 210<br />
350 717.01<br />
3268.89<br />
Gas Turbine 3x27.5 - 82.5<br />
at Maithon<br />
Hydel<br />
82.5 40.00<br />
Tilaiya 2x2 4 10.99<br />
Panchet 1x40 40 164.24<br />
Maithon 3x20 60 136.<strong>92</strong><br />
312.15<br />
Total Generation : 3621.04<br />
• BTPS 'A' Unit 4 derated to 40 MW from Janaury, 1990.<br />
•• Panchet unit 2 synchronised on 5.3.91 and generated<br />
80.46 MU upto 30.11.91.<br />
The position relating to the on-going generation and<br />
transmission projects <strong>of</strong> the Corporation is given in the<br />
table on the following page.