6.3 Capacity Additons<br />
By end March, 91 NTPC had commissioned 10, 125 MW<br />
at its various Stations. Details <strong>of</strong> capacity commissioned<br />
are given below :<br />
Project Capacity commissioned<br />
Singrauli 2000 MW<br />
Korba 2100 MW<br />
Ramagundam 2100 MW<br />
Farakka 500 MW<br />
Rihand 1000 MW<br />
Vindhyachal 1260 MW<br />
Anta 413 MW<br />
Auraiya 652 MW<br />
TOTAL 10125 MW<br />
During the year <strong>1991</strong>-<strong>92</strong>, the NTPC has programmed to<br />
commission 788 MW comprising 210 MW from NCTPP,<br />
210 MW from Kahalgaon, 262 MW from Dadri Gas<br />
Project and 106 MW from Kawas Gas Project. Of this,<br />
the 210 MW Unit at National Capital Thermal <strong>Power</strong><br />
Project; Dadri has already been commissioned. With this<br />
the total installed capacity <strong>of</strong> NTPC stands increased to<br />
10335 MW. The other Units programmed for<br />
commissioning this year are progressing satisfactorily.<br />
6.4 Transmission Lines<br />
NTPC - Kahalgaon Super Thermal <strong>Power</strong> Project<br />
35<br />
By end March, 91 NTPC had completed 153.89 ckt. Kms<br />
<strong>of</strong> transmission lines. During 91-<strong>92</strong>, NTPC has<br />
programmed to add 860 Ckt. Kms. NTPC has already<br />
completed 775 ckt. kms. <strong>of</strong> transmission lines thereby<br />
raising the total length <strong>of</strong> high voltage lines laid by NTPC<br />
to 16511 Ckt. Kms.<br />
The following transmission lines have been fully<br />
completed during the year <strong>1991</strong>-<strong>92</strong>.<br />
1. Agra-Chatta 400 KV S/C<br />
2. Chatta-Ballabgarh 400 KV S/C<br />
3. Vijayawada-Gazuwaka 400 KV S/C<br />
4. Gooty-Bangalore 400 KV S/C<br />
5. Maithon-Jamshedpur 400 KV D/C<br />
6.5 Generation<br />
As on end December, <strong>1991</strong> a total capacity <strong>of</strong> 10335 MW<br />
is under operation at various NTPC Stations. This<br />
comprised 22 Units <strong>of</strong> 200/210 MW at Singrauli, Korba,<br />
Ramagundam, Farakka, Vindhyachal and NCTPP, 10<br />
Units <strong>of</strong> 500 MW at Singrauli, Korba, Ramagundam and<br />
Rihand and 10 Gas/Steam Units at Anta and Auraiya.<br />
The generation from NTPC stations has been at a