6.3 Capacity Additons<br />

By end March, 91 NTPC had commissioned 10, 125 MW<br />

at its various Stations. Details <strong>of</strong> capacity commissioned<br />

are given below :<br />

Project Capacity commissioned<br />

Singrauli 2000 MW<br />

Korba 2100 MW<br />

Ramagundam 2100 MW<br />

Farakka 500 MW<br />

Rihand 1000 MW<br />

Vindhyachal 1260 MW<br />

Anta 413 MW<br />

Auraiya 652 MW<br />

TOTAL 10125 MW<br />

During the year <strong>1991</strong>-<strong>92</strong>, the NTPC has programmed to<br />

commission 788 MW comprising 210 MW from NCTPP,<br />

210 MW from Kahalgaon, 262 MW from Dadri Gas<br />

Project and 106 MW from Kawas Gas Project. Of this,<br />

the 210 MW Unit at National Capital Thermal <strong>Power</strong><br />

Project; Dadri has already been commissioned. With this<br />

the total installed capacity <strong>of</strong> NTPC stands increased to<br />

10335 MW. The other Units programmed for<br />

commissioning this year are progressing satisfactorily.<br />

6.4 Transmission Lines<br />

NTPC - Kahalgaon Super Thermal <strong>Power</strong> Project<br />

35<br />

By end March, 91 NTPC had completed 153.89 ckt. Kms<br />

<strong>of</strong> transmission lines. During 91-<strong>92</strong>, NTPC has<br />

programmed to add 860 Ckt. Kms. NTPC has already<br />

completed 775 ckt. kms. <strong>of</strong> transmission lines thereby<br />

raising the total length <strong>of</strong> high voltage lines laid by NTPC<br />

to 16511 Ckt. Kms.<br />

The following transmission lines have been fully<br />

completed during the year <strong>1991</strong>-<strong>92</strong>.<br />

1. Agra-Chatta 400 KV S/C<br />

2. Chatta-Ballabgarh 400 KV S/C<br />

3. Vijayawada-Gazuwaka 400 KV S/C<br />

4. Gooty-Bangalore 400 KV S/C<br />

5. Maithon-Jamshedpur 400 KV D/C<br />

6.5 Generation<br />

As on end December, <strong>1991</strong> a total capacity <strong>of</strong> 10335 MW<br />

is under operation at various NTPC Stations. This<br />

comprised 22 Units <strong>of</strong> 200/210 MW at Singrauli, Korba,<br />

Ramagundam, Farakka, Vindhyachal and NCTPP, 10<br />

Units <strong>of</strong> 500 MW at Singrauli, Korba, Ramagundam and<br />

Rihand and 10 Gas/Steam Units at Anta and Auraiya.<br />

The generation from NTPC stations has been at a