Metrolink peer review report - Ventura County Star
Metrolink peer review report - Ventura County Star
Metrolink peer review report - Ventura County Star
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
METROLINK COMMUTER RAIL SAFETY PEER REVIEW PANEL<br />
Final Report – January 5, 2009<br />
Issue Papers<br />
within the system-specific software. The system logic is then thoroughly tested for compatibility with the DigiCon<br />
system and adjusted, if necessary, prior to full service.<br />
<strong>Metrolink</strong> signal engineers have been trained to maintain the hardware of the DigiCon system, and have been<br />
trained on the diagnostics and trouble shooting of the system. In addition, SCRRA maintains an inventory of<br />
spare parts. A redundant system is in place should the software fail and there is an ability to resurrect the system<br />
through backups. These measures suggest that, while the solution regarding Digicon is not ideal, <strong>Metrolink</strong> has<br />
taken effective steps to guard against dispatching system failure in the near to mid-term.<br />
58