10.08.2013 Views

Metrolink peer review report - Ventura County Star

Metrolink peer review report - Ventura County Star

Metrolink peer review report - Ventura County Star

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROLINK COMMUTER RAIL SAFETY PEER REVIEW PANEL<br />

Final Report – January 5, 2009<br />

Issue Papers<br />

within the system-specific software. The system logic is then thoroughly tested for compatibility with the DigiCon<br />

system and adjusted, if necessary, prior to full service.<br />

<strong>Metrolink</strong> signal engineers have been trained to maintain the hardware of the DigiCon system, and have been<br />

trained on the diagnostics and trouble shooting of the system. In addition, SCRRA maintains an inventory of<br />

spare parts. A redundant system is in place should the software fail and there is an ability to resurrect the system<br />

through backups. These measures suggest that, while the solution regarding Digicon is not ideal, <strong>Metrolink</strong> has<br />

taken effective steps to guard against dispatching system failure in the near to mid-term.<br />

58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!