16.08.2013 Views

Quantifying Uncontrolled Landfill Gas Emissions from Two Florida ...

Quantifying Uncontrolled Landfill Gas Emissions from Two Florida ...

Quantifying Uncontrolled Landfill Gas Emissions from Two Florida ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 2-2. Detail of measurement configuration at the control cell of Site #1<br />

2.1.2 Bioreactor Cell<br />

The bioreactor cell was located on the eastern side of landfill Site #1 (see Figure 1-1). ORS<br />

measurements were collected in this cell on February 22. The bioreactor cell was accepting<br />

waste during the time of the measurements, so it was not possible to deploy the instrumentation<br />

over the entire footprint of the cell due to heavy machinery traffic associated with landfill<br />

operations. The VRPM configuration consisted of a scanning OP-FTIR instrument, a scanning<br />

OP-TDLAS instrument, and two vertical structures. The OP-FTIR was deployed in the<br />

northwestern corner of the cell, the OP-TDLAS was deployed in the southeastern corner of the<br />

cell, and the two vertical structures were deployed in the northeastern and southwestern corners<br />

of the cell, respectively. The work face was located in the eastern portion of the landfill cell.<br />

Figure 2-3 presents a schematic of the measurement configuration used in the Bioreactor Cell,<br />

showing the distances of the VRPM planes. The dashed black lines depict the location of the four<br />

VRPM measurement planes. The dashed yellow line indicates the configuration used to collect<br />

background measurements at the site.<br />

2-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!