18.08.2013 Views

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application for New License <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong> (<strong>FERC</strong> <strong>Project</strong> <strong>No</strong>. <strong>2079</strong>)<br />

BA/BE Table 11. Description of Current Facility Inspections, Testing, and Maintenance Activities at <strong>Project</strong> Facilities and Features (continued).<br />

<strong>Project</strong> Facility or Feature<br />

<strong>Project</strong> Communication Lines and Powerlines (continued)<br />

<strong>Middle</strong> <strong>Fork</strong> Interbay Area<br />

<strong>Middle</strong> <strong>Fork</strong> Powerhouse to <strong>Middle</strong> <strong>Fork</strong> Powerhouse Butterfly Valve House<br />

Communication Line/Powerline<br />

<strong>Middle</strong> <strong>Fork</strong> Powerhouse Butterfly Valve House to Radio Repeater near Hell Hole –<br />

<strong>Middle</strong> <strong>Fork</strong> Tunnel Surge Tank (underground) Communication Line/Powerline<br />

<strong>Middle</strong> <strong>Fork</strong> Powerhouse to <strong>Middle</strong> <strong>Fork</strong> – Ralston Tunnel Intake and Gatehouse<br />

Communication Line/Powerline<br />

<strong>Middle</strong> <strong>Fork</strong> Powerhouse to <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> Gage above <strong>Middle</strong> <strong>Fork</strong><br />

Powerhouse Communication Line/Powerline<br />

Inspections<br />

and Maintenance<br />

Tunnel and Powerhouse<br />

Inspection, Testing, &<br />

Maintenance<br />

Spillway & Tainter Gate Testing<br />

Trimming by Hand<br />

Vegetation<br />

Management<br />

Trimming w/Equipment<br />

Herbicide Use<br />

Physical Control (snap traps)<br />

Over-the-Counter Rodenticide Use<br />

Sediment<br />

Management<br />

Physical Removal w/Equipment<br />

Gunite (erosion control)<br />

A I<br />

A I<br />

A I<br />

A I<br />

Ralston – Oxbow Area<br />

Ralston – Oxbow Tunnel Intake to Ralston Powerhouse Communication Line A I<br />

Ralston Powerhouse to Ralston Powerhouse Butterfly Valve House Communication<br />

Line/Powerline<br />

A I<br />

Ralston Afterbay Dam Generator Building to Ralston – Oxbow Tunnel Intake<br />

Communication Line/Powerline<br />

A I<br />

Oxbow Powerhouse to Ralston Afterbay Dam Generator Building Communication<br />

Line/Powerline<br />

Photovoltaic Poles and Powerlines<br />

A I<br />

Photovoltaic Poles and Powerline to Duncan Creek Gage near French Meadows A<br />

Photovoltaic Pole and Powerline at Duncan Creek Gage below Diversion Dam A<br />

Photovoltaic Pole and Powerline at <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> Gage at French<br />

Meadows<br />

A<br />

Photovoltaic Pole and Powerline at <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> Gage above <strong>Middle</strong><br />

<strong>Fork</strong> Powerhouse<br />

A<br />

Photovoltaic Pole and Powerline at <strong>No</strong>rth <strong>Fork</strong> Long Canyon Creek Gage below<br />

Diversion Dam<br />

A<br />

Photovoltaic Pole and Powerline at South <strong>Fork</strong> Long Canyon Creek Gage below<br />

Diversion Dam<br />

A<br />

Photovoltaic Pole and Powerline at <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> Gage near Foresthill<br />

Microwave Reflectors and Radio Towers<br />

A<br />

Passive Microwave Reflector Station above <strong>Middle</strong> <strong>Fork</strong> Interbay I<br />

Radio Communications Tower near French Meadows – Hell Hole Tunnel Gatehouse I<br />

Radio Communications Tower and Repeater near Hell Hole – <strong>Middle</strong> <strong>Fork</strong> Tunnel Surge<br />

Shaft and Tank<br />

I<br />

Passive Microwave Reflector Station above Ralston Afterbay I<br />

February 2011 35<br />

Pest<br />

Management<br />

Inspections, Testing, and Maintenance Activities<br />

Slope<br />

Stabilization<br />

(Falling Rock Control)<br />

Rock Removal/Fence Repair<br />

Large Woody Debris<br />

Debris<br />

Management<br />

Cleaning Trash Racks<br />

Log Booms<br />

Facility Painting<br />

Pole Replacement/Retrofit<br />

Road<br />

Maintenance<br />

Annual Maintenance<br />

Periodic Maintenance

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!