18.08.2013 Views

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Application for New License <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong> (<strong>FERC</strong> <strong>Project</strong> <strong>No</strong>. <strong>2079</strong>)<br />

BA/BE Table 30. Raptor Nests and Roosts and USDA-FS Land Allocations and Important Habitat in Relation to<br />

<strong>Project</strong> Facilities and Features and Recreation Facilities and Features (continued).<br />

<strong>Project</strong> Facilities and Features<br />

Gaging Stations and Weirs (continued)<br />

Powerhouse Gages<br />

French Meadows Powerhouse (USGS Gage <strong>No</strong>. 11427200)<br />

<strong>Middle</strong> <strong>Fork</strong> Powerhouse (USGS Gage <strong>No</strong>. 11428600)<br />

Ralston Powerhouse (USGS Gage <strong>No</strong>. 11427765)<br />

Oxbow Powerhouse (USGS Gage <strong>No</strong>. 11433212)<br />

Oxbow Powerhouse Penstock (OXBPP) (new) 8<br />

Leakage Weirs<br />

French Meadows Dam Leakage Weirs <strong>No</strong>s. 1–6<br />

Hell Hole Dam Leakage Weir<br />

<strong>Project</strong> Communication Lines and Powerlines<br />

French Meadows Area<br />

French Meadows Dam Generator Building to French Meadows Dam Outlet Works<br />

Powerline<br />

French Meadows Dam Generator Building to French Meadows Dam Spillway Gates<br />

Powerline<br />

Hell Hole Area<br />

French Meadows Powerhouse to French Meadows Powerhouse Penstock and Butterfly<br />

Valve House Communication Line/Powerline<br />

French Meadows Powerhouse and Switchyard to Hell Hole - <strong>Middle</strong> <strong>Fork</strong> Tunnel<br />

Gatehouse, Dormitory Facility, Operator’s Cottages, and Hell Hole Powerhouse<br />

Communication Line/Powerline<br />

Dormitory and Cottages Water Supply Tank Powerline<br />

February 2011 89<br />

Bald Eagle Nest 1<br />

Bald Eagle Night<br />

Roost 1<br />

Raptor Nests<br />

and Roosts<br />

Osprey Nest 2<br />

CSO<br />

Nest 3<br />

NOGO<br />

Nest 3<br />

USDA-FS<br />

Land Allocations<br />

and Important Habitats<br />

CSO<br />

PAC 4<br />

CSO<br />

HRCA 5<br />

NOGO<br />

PAC 4<br />

Important Mule<br />

Deer Habitat 6<br />

X

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!