Application for New License <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong> (<strong>FERC</strong> <strong>Project</strong> <strong>No</strong>. <strong>2079</strong>)<br />

Proposed Action are depicted on BA/BE Maps 3a–e, and land jurisdictions in the<br />

immediate vicinity of the MFP are shown on Exhibit E – Section 4.0, Maps 4-2–e.<br />

Changes under the Proposed Action are described below, organized by facility type.<br />

4.2.1.1 Large Dams and Reservoirs<br />

• French Meadows Dam Outlet Works (modified)<br />

French Meadows Dam Outlet Works will be modified as part of the French<br />

Meadows Outlet Works Modification to provide and monitor new MIFs, pulse<br />

flows, and downramp or spill flow requirements under the Proposed Action. In<br />

addition, two new gages will be installed to monitor compliance with instream<br />

flow requirements.<br />

• Hell Hole Dam Outlet Works (modified)<br />

Hell Hole Dam Outlet Works will be modified as part of the Hell Hole Dam Outlet<br />

Works Modification to provide and monitor new MIFs, pulse flows, and downramp<br />

or spill flow requirements under the Proposed Action. Hell Hole Dam will be<br />

modified as part of the Hell Hole Reservoir Seasonal Storage Increase<br />

Improvement by adding 6-foot-high crest gates on the existing Hell Hole Dam<br />

Spillway. These crest gates may be raised under certain conditions to increase<br />

Hell Hole Reservoir storage.<br />

4.2.1.2 Medium Dams and Reservoirs<br />

• <strong>Middle</strong> <strong>Fork</strong> Interbay Dam Outlet Works (modified)<br />

<strong>Middle</strong> <strong>Fork</strong> Interbay Dam Outlet Works will be modified to meet new MIFs.<br />

• Ralston Afterbay Dam Outlet Works<br />

A new gage will be installed at the Ralston Afterbay Dam Outlet Works to monitor<br />

MIFs.<br />

4.2.1.3 Small Dams and Diversion Pools<br />

The small diversions on Duncan Creek, <strong>No</strong>rth <strong>Fork</strong> Long Canyon Creek, and South<br />

<strong>Fork</strong> Long Canyon Creek will be modified to increase natural sediment delivery and<br />

transport of bedload and fine material downstream. Activities at the small diversions<br />

include installation of self-cleaning wedge-wire screens at the dams, modification of the<br />

low-level outlets to release the required instream flows, and modification or installation<br />

of gages. The small diversion modifications will result in diversion pools that are<br />

shallower and more riverine.<br />