18.08.2013 Views

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

FERC Project No. 2079 - PCWA Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application for New License <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> <strong>Project</strong> (<strong>FERC</strong> <strong>Project</strong> <strong>No</strong>. <strong>2079</strong>)<br />

• September 28, 2010: Draft License Application, including the Draft BA/BE,<br />

submitted to USFWS for a 90-day comment period. <strong>No</strong> comments received from<br />

USFWS.<br />

• January 11, 2011: USFWS states in a telephone message that the Draft BA/BE<br />

had been reviewed, and that it included all necessary information to evaluate<br />

potential project effects under ESA Section 7.<br />

The Draft BA/BE, which incorporates relicensing participant comments, is included in<br />

the Final License Application. This Draft BA/BE will be reviewed by <strong>FERC</strong> and used in<br />

conducting interagency consultation with USFWS. <strong>FERC</strong> will initiate this consultation<br />

by providing USFWS with a copy of the Draft BA/BE (as approved by <strong>FERC</strong>) and<br />

requesting formal consultation after submittal of the Final License Application by <strong>PCWA</strong>.<br />

<strong>FERC</strong> will also request that USFWS provide a biological opinion on their findings no<br />

later than 135 days from receipt of the request for formal consultation.<br />

February 2011 2-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!