21.08.2013 Views

Installation of Fixed Capacitive HSWIM Sensors

Installation of Fixed Capacitive HSWIM Sensors

Installation of Fixed Capacitive HSWIM Sensors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 6b: Acceptance certificate for TEL cap WIM site<br />

Name <strong>of</strong> site:<br />

Site number:<br />

Name <strong>of</strong> client:<br />

Name <strong>of</strong> contractor:<br />

Acceptance Check List<br />

Description In Order Remarks<br />

1. Documentation<br />

a. Detailed site sketch Y/N<br />

b. Locality sketch Y/N<br />

c. Locality information Table 1 Y/N<br />

d. Lane information Table 2 Y/N<br />

e. Approvals Table 3 Y/N<br />

f. Sensor description Table 4 & 4b Y/N<br />

h. Construction quality report Tab 5 Y/N<br />

2. Physical Appearance<br />

a. Saw-cuts and sealant Y/N<br />

b. Trenches Y/N<br />

c. Mounting block Y/N<br />

d. Draw boxes Y/N<br />

e. General Y/N<br />

3. Loops Table 6 Filed Y/N<br />

4. <strong>Capacitive</strong> sensor Table 4b Filed Y/N<br />

5. Support slab approved Y/N<br />

Site Acceptable YES NO If no attach a snag list.<br />

Signatures:<br />

Client representative:<br />

Contractor:<br />

Name Signature Date<br />

MS001-96100-52 <strong>Installation</strong> <strong>of</strong> <strong>Fixed</strong> <strong>Capacitive</strong> <strong>HSWIM</strong> <strong>Sensors</strong> Issue5 1 March 2005<br />

50 / 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!