01.10.2013 Views

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CSI Spec<br />

Number<br />

078123 144<br />

078123 145<br />

078123 146<br />

078123 147<br />

078123 148<br />

078123 149<br />

078123 150<br />

078413 151<br />

078413 152<br />

078413 153<br />

078413 154<br />

078413 155<br />

078446 156<br />

078446 157<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES Product Certificates SC-14 Q 5 1.3.C<br />

YES Evaluation Reports<br />

5 days after<br />

activity<br />

Q 5 1.3.D<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

078413 PENETRATION<br />

FIRESTOPPING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.E<br />

EC FP 5 1.4.A<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Product Schedule SC-14 Eng 5 1.2.B<br />

YES<br />

Qualification Data for Qualified<br />

Installer<br />

SC-14 Q 5 1.2.C<br />

YES Product Test Report SC-14 FP 5 1.2.D<br />

YES<br />

As-Built Drawings for Fire Marshal<br />

Approval<br />

078446 - FIRE-RESISTIVE<br />

JOINT SYSTEMS<br />

EC FP 5 1.3.A<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Product Schedule SC-14 FP 5 1.2.B<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 12 of 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!