ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CSI Spec<br />
Number<br />
22<strong>05</strong>29 237<br />
22<strong>05</strong>29 238<br />
22<strong>05</strong>29 239<br />
22<strong>05</strong>33 240<br />
22<strong>05</strong>33 241<br />
22<strong>05</strong>33 242<br />
22<strong>05</strong>33 243<br />
22<strong>05</strong>33 244<br />
22<strong>05</strong>33 245<br />
22<strong>05</strong>48 246<br />
22<strong>05</strong>48 247<br />
1. Number 2. Type & Format<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
AP<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
DWG;PDF<br />
APW<br />
PDF<br />
AP<br />
PDF<br />
AP<br />
PDF<br />
FIO<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />
48873-MSR-001, Rev 0<br />
The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />
3. Technical<br />
Submittal<br />
YES<br />
4. Vendor<br />
Information<br />
5. Description / Document Title<br />
Welding Inspection Plan - Weld<br />
Inspection and Test Reports (weld<br />
maps, gamma scan, radiograph)<br />
6. Submittal Date<br />
(Calendar Days)<br />
7. Approver<br />
(Organizations)<br />
8. CHPRC<br />
Reviewer<br />
Time (Work<br />
Days)<br />
9. Contract Paragraph<br />
or Requirement<br />
Reference<br />
SC-14 Q 5 1.4.E<br />
YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />
YES Field Quality Control Reports<br />
22<strong>05</strong>33 – HEAT TRACING FOR<br />
PLUMBING PIPING<br />
5 days after<br />
activity<br />
completion<br />
Q 5 1.4.F<br />
YES YES Product Data SC-14 Q 5 1.3.A<br />
YES Shop Drawings SC-14 Eng 5 1.3.B<br />
YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />
YES Field Quality Control Reports<br />
5 days after<br />
activity<br />
completion<br />
Q 5 1.3.C<br />
YES YES Operation and Maintenance Data EC Eng 5 1.3.D<br />
YES Warranty EC BTR NA 1.3.E<br />
22<strong>05</strong>48 - VIBRATION AND<br />
SEISMIC CONTROLS FOR<br />
PLUMBING PIPING AND<br />
EQUIPMENT<br />
YES YES Product Data SC-14 Q 5 1.5.A<br />
YES<br />
Welding Procedure<br />
Specifications/Procedure<br />
Qualification Records<br />
SC-14 Eng 5 1.5.B<br />
5/17/2012 Modified KW Basin Annex Construction, Rev 0 19 of 46