ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CSI Spec<br />
Number<br />
431510 584<br />
431510 585<br />
431510 586<br />
1. Number 2. Type & Format<br />
AP<br />
PDF<br />
AP<br />
PDF<br />
AP<br />
PDF<br />
<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />
48873-MSR-001, Rev 0<br />
The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />
3. Technical<br />
Submittal<br />
4. Vendor<br />
Information<br />
5. Description / Document Title<br />
YES Field Quality Control Reports<br />
6. Submittal Date<br />
(Calendar Days)<br />
5 days after<br />
activity<br />
completion<br />
7. Approver<br />
(Organizations)<br />
8. CHPRC<br />
Reviewer<br />
Time (Work<br />
Days)<br />
9. Contract Paragraph<br />
or Requirement<br />
Reference<br />
Q 5 1.3.I<br />
YES YES Operation and Maintenance Data EC Eng 5 1.3.J<br />
YES YES Final Data Package EC+14 Eng 5 1.3.K<br />
5/17/2012 Modified KW Basin Annex Construction, Rev 0 45 of 46