ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CSI Spec<br />
Number<br />
111300 210<br />
111300 211<br />
111300 212<br />
211220 213<br />
211313 214<br />
211313 215<br />
211313 216<br />
211313 217<br />
211313 218<br />
211313 219<br />
211313 220<br />
211313 221<br />
211313 222<br />
211313 223<br />
211313 224<br />
1. Number 2. Type & Format<br />
APW<br />
PDF<br />
APW<br />
DWG;PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
DWG;PDF<br />
AP<br />
DWG;PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
AP<br />
PDF<br />
<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />
48873-MSR-001, Rev 0<br />
The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />
3. Technical<br />
Submittal<br />
4. Vendor<br />
Information<br />
5. Description / Document Title<br />
111300 - LOADING DOCK<br />
EQUIPMENT<br />
6. Submittal Date<br />
(Calendar Days)<br />
7. Approver<br />
(Organizations)<br />
8. CHPRC<br />
Reviewer<br />
Time (Work<br />
Days)<br />
9. Contract Paragraph<br />
or Requirement<br />
Reference<br />
YES YES Product Data SC-14 Q 5 1.2.A<br />
YES Shop Drawings SC-14 Eng 5 1.2.B<br />
YES YES Operation and Maintenance Data EC BTR 5 1.3.A<br />
211220– STORAGE TANKS<br />
YES YES Catalog Data SC-14 Eng 5 1.3.A.1<br />
211313 – WET PIPE<br />
SPRINKLER SYSTEM<br />
YES Shop Drawings SC-21 Eng 5 1.3.A.1<br />
YES As Built Drawings EC+14 FP 5 1.3.A.2<br />
YES YES List of Submittals SC-30 Eng 5 1.3.B.1<br />
YES YES Product Data SC-14 Q 5 1.3.B.2<br />
YES YES Spare Parts Data SC-21 FP 5 1.3.B.3<br />
YES<br />
Fire Protection Specialist<br />
Documentation<br />
SC-45 FP 5 1.3.B.4<br />
YES Installer Qualifications SC-14 Q 5 1.3.B.5<br />
YES Sway Bracing Calculations SC-21 Eng 5 1.3.C.1<br />
YES Hydraulic Calculations SC-14 Eng 5 1.3.C.2<br />
YES<br />
YES<br />
Preliminary Acceptance Test<br />
Procedure<br />
Preliminary Acceptance Test<br />
Report<br />
SC-14 Q 5 1.3.D.1.a<br />
EC+7 Q 5 1.3.D.1.b<br />
5/17/2012 Modified KW Basin Annex Construction, Rev 0 17 of 46