01.10.2013 Views

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CSI Spec<br />

Number<br />

1. Number 2. Type & Format<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

331116 559<br />

AP<br />

PDF<br />

YES Cleaning Reports EC E 5 1.2.C<br />

331116 560<br />

AP<br />

PDF<br />

YES YES Operation and Maintenance Data<br />

40<strong>05</strong>27 – PIPING AND<br />

TUBINGINSPECTION<br />

CHECKLIST<br />

EC Eng 5 1.2.D<br />

40<strong>05</strong>27 561 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

40<strong>05</strong>27 562<br />

40<strong>05</strong>27 563<br />

40<strong>05</strong>27 564<br />

402319 565<br />

402319 566<br />

402319 567<br />

402319 568<br />

402319 569<br />

402319 570<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.3.A<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

402319 – PROCESS PLANT<br />

NON-POTABLE WATER PIPE<br />

(MODIFIED FOR IXM)<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.3.B<br />

YES YES Product Data SC-14 Q 5 1.3.B<br />

YES Fabrication Drawings SC-14 Eng 5 1.3.C<br />

YES Piping Material Certification SC-14 Q 5 1.3.D<br />

YES Certificates of Shop Inspection SC-14 Q 5 1.3.E<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AWS<br />

D1.1<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records for AMSE<br />

B31.3<br />

SC-14 Eng 5 1.3.F<br />

SC-14 Eng 5 1.3.G<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 43 of 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!