01.10.2013 Views

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CSI Spec<br />

Number<br />

<strong>05</strong>5100 102<br />

<strong>05</strong>5100 103<br />

<strong>05</strong>5100 104<br />

<strong>05</strong>5100 1<strong>05</strong><br />

<strong>05</strong>5100 106<br />

<strong>05</strong>5100 107<br />

<strong>05</strong>5100 108<br />

<strong>05</strong>5213 1<strong>09</strong><br />

<strong>05</strong>5213 110<br />

<strong>05</strong>5213 111<br />

<strong>05</strong>5213 112<br />

<strong>05</strong>5300 113<br />

<strong>05</strong>5300 114<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.2.G<br />

YES Welding Certificates SC-14 Eng 5 1.2.H<br />

YES Mill Test Reports SC-14 Q 5 1.2.I<br />

YES Source Quality Control Reports SC-14 Q 5 1.2.J<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

YES<br />

Independent Laboratory Testing<br />

Quality Control Reports<br />

<strong>05</strong>5213 PIPE AND TUBE<br />

RAILINGS<br />

5 days after<br />

activity<br />

completion<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.K<br />

Q 5 1.2.L<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

<strong>05</strong>5300 METAL GRATING<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.C<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

061000 ROUGH CARPENTRY<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 9 of 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!