CSI Spec<br />
Number<br />
033000 <strong>05</strong>0<br />
<strong>05</strong>1200 <strong>05</strong>1<br />
<strong>05</strong>1200 <strong>05</strong>2<br />
<strong>05</strong>1200 <strong>05</strong>3<br />
<strong>05</strong>1200 <strong>05</strong>4<br />
<strong>05</strong>1200 <strong>05</strong>5<br />
<strong>05</strong>1200 <strong>05</strong>6<br />
<strong>05</strong>1200 <strong>05</strong>7<br />
<strong>05</strong>1200 <strong>05</strong>8<br />
<strong>05</strong>1200 <strong>05</strong>9<br />
<strong>05</strong>1200 060<br />
<strong>05</strong>1200 061<br />
1. Number 2. Type & Format<br />
AP<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
DWG;PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
APW<br />
PDF<br />
<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />
48873-MSR-001, Rev 0<br />
The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />
3. Technical<br />
Submittal<br />
4. Vendor<br />
Information<br />
5. Description / Document Title<br />
Minutes of Preinstallation<br />
Conference<br />
<strong>05</strong>1200 STRUCTURAL STEEL<br />
FRAMING<br />
6. Submittal Date<br />
(Calendar Days)<br />
5 days after<br />
activity<br />
completion<br />
7. Approver<br />
(Organizations)<br />
8. CHPRC<br />
Reviewer<br />
Time (Work<br />
Days)<br />
9. Contract Paragraph<br />
or Requirement<br />
Reference<br />
CM 5 1.2.U<br />
YES YES Product Data SC-14 Q 5 1.3.A<br />
YES Shop Drawings SC-14 Eng 5 1.3.B<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
YES<br />
Welding Procedure<br />
Specifications/Procedure<br />
Qualification Records<br />
Qualification Data for Qualified<br />
Installer<br />
Qualification Data for Qualified<br />
Fabricator<br />
Qualification Data for Qualified<br />
Testing Agency<br />
Welding Inspection Plan - Weld<br />
Inspection and Test Teports (weld<br />
maps, gamma scan, radiograph)<br />
NDE Qualification and Cert<br />
Procedures (Personnel Level I, II,<br />
III, quals and certs NDE method,<br />
exam procedures)<br />
SC-14 Eng 5 1.3.C<br />
SC-14 Q 5 1.3.D<br />
SC-14 Q 5 1.3.E<br />
SC-14 Q 5 1.3.F<br />
SC-14 Q 5 1.3.G<br />
SC-14 Q 5 1.3.H<br />
YES Grout Plan SC-14 Eng 5 1.3.I<br />
YES Welding Certificates SC-14 Eng 5 1.3.J<br />
YES YES Mill Test Reports SC-14 Q 5 1.3.K<br />