ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CSI Spec<br />

Number<br />

033000 <strong>05</strong>0<br />

<strong>05</strong>1200 <strong>05</strong>1<br />

<strong>05</strong>1200 <strong>05</strong>2<br />

<strong>05</strong>1200 <strong>05</strong>3<br />

<strong>05</strong>1200 <strong>05</strong>4<br />

<strong>05</strong>1200 <strong>05</strong>5<br />

<strong>05</strong>1200 <strong>05</strong>6<br />

<strong>05</strong>1200 <strong>05</strong>7<br />

<strong>05</strong>1200 <strong>05</strong>8<br />

<strong>05</strong>1200 <strong>05</strong>9<br />

<strong>05</strong>1200 060<br />

<strong>05</strong>1200 061<br />

1. Number 2. Type & Format<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Minutes of Preinstallation<br />

Conference<br />

<strong>05</strong>1200 STRUCTURAL STEEL<br />

FRAMING<br />

6. Submittal Date<br />

(Calendar Days)<br />

5 days after<br />

activity<br />

completion<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

CM 5 1.2.U<br />

YES YES Product Data SC-14 Q 5 1.3.A<br />

YES Shop Drawings SC-14 Eng 5 1.3.B<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Qualification Data for Qualified<br />

Installer<br />

Qualification Data for Qualified<br />

Fabricator<br />

Qualification Data for Qualified<br />

Testing Agency<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Teports (weld<br />

maps, gamma scan, radiograph)<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

SC-14 Eng 5 1.3.C<br />

SC-14 Q 5 1.3.D<br />

SC-14 Q 5 1.3.E<br />

SC-14 Q 5 1.3.F<br />

SC-14 Q 5 1.3.G<br />

SC-14 Q 5 1.3.H<br />

YES Grout Plan SC-14 Eng 5 1.3.I<br />

YES Welding Certificates SC-14 Eng 5 1.3.J<br />

YES YES Mill Test Reports SC-14 Q 5 1.3.K<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 5 of 46