01.10.2013 Views

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

ANNEX SUBMITTAL REGISTER - MASTER - 05-09-2012.xlsx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CSI Spec<br />

Number<br />

23<strong>05</strong>29 298<br />

23<strong>05</strong>29 299<br />

23<strong>05</strong>29 300<br />

23<strong>05</strong>29 301<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

CWI Documentation (Certs, VT,<br />

inspection documents)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Eng 5 1.4.B<br />

SC-14 Q 5 1.4.C<br />

YES Welding Certificates SC-14 Eng 5 1.4.D<br />

YES Weld Inspection Reports SC-14 Eng 5 1.4.E<br />

23<strong>05</strong>29 302 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

23<strong>05</strong>29 303<br />

23<strong>05</strong>48 304<br />

23<strong>05</strong>48 3<strong>05</strong><br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

YES Field Quality Control Reports<br />

23<strong>05</strong>48 - VIBRATION AND<br />

SEISMIC CONTROLS FOR<br />

HVAC PIPING AND<br />

EQUIPMENT<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.4.F<br />

YES YES Product Data SC-14 Q 5 1.5.A<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

SC-14 Eng 5 1.5.B<br />

23<strong>05</strong>48 306<br />

APW<br />

PDF<br />

YES Welding Certificates SC-14 Eng 5 1.5.C<br />

23<strong>05</strong>48 307<br />

APW<br />

PDF<br />

YES<br />

Qualification Data for Testing<br />

Agency<br />

SC-14 Q 5 1.5.D<br />

23<strong>05</strong>48 308 APW PDF YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

23<strong>05</strong>48 3<strong>09</strong><br />

AP<br />

PDF<br />

YES Field Quality Control Reports<br />

23<strong>05</strong>53 - IDENTIFICATION<br />

FOR HVAC PIPING AND<br />

EQUIPMENT<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.5.E<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 24 of 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!