CSI Spec<br />

Number<br />

<strong>05</strong>3100 075<br />

<strong>05</strong>3100 076<br />

<strong>05</strong>3100 077<br />

<strong>05</strong>3100 078<br />

<strong>05</strong>3100 079<br />

<strong>05</strong>5000 080<br />

<strong>05</strong>5000 081<br />

<strong>05</strong>5000 082<br />

<strong>05</strong>5000 083<br />

<strong>05</strong>5000 084<br />

<strong>05</strong>5000 085<br />

<strong>05</strong>5000 086<br />

<strong>05</strong>5000 087<br />

1. Number 2. Type & Format<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

AP<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

DWG;PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

APW<br />

PDF<br />

<strong>MASTER</strong> <strong>SUBMITTAL</strong> <strong>REGISTER</strong><br />

48873-MSR-001, Rev 0<br />

The Contractor shall meet the required schedule and provide the documents specified in accordance with the following submittals.<br />

3. Technical<br />

Submittal<br />

YES<br />

4. Vendor<br />

Information<br />

5. Description / Document Title<br />

NDE qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

6. Submittal Date<br />

(Calendar Days)<br />

7. Approver<br />

(Organizations)<br />

8. CHPRC<br />

Reviewer<br />

Time (Work<br />

Days)<br />

9. Contract Paragraph<br />

or Requirement<br />

Reference<br />

SC-14 Q 5 1.2.H<br />

YES Welding Certificates SC-14 Eng 5 1.2.I<br />

YES Product Certificates SC-14 Eng 5 1.2.J<br />

YES Quality Assurance Inspection Plan SC-14 Q 5 014000<br />

YES Field Quality Control Reports<br />

<strong>05</strong>5000 METAL<br />

FABRICATIONS<br />

5 days after<br />

activity<br />

completion<br />

Q 5 1.2.K<br />

YES YES Product Data SC-14 Q 5 1.2.A<br />

YES Shop Drawings SC-14 Eng 5 1.2.B<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

YES<br />

Welding Procedure<br />

Specifications/Procedure<br />

Qualification Records<br />

Qualification Data for Qualified<br />

Installer<br />

Qualification Data for Qualified<br />

Fabricator<br />

Qualification Data for Qualified<br />

Testing Agency<br />

Welding Inspection Plan - Weld<br />

Inspection and Test Reports (weld<br />

maps, gamma scan, radiograph)<br />

NDE Qualification and Cert<br />

Procedures (Personnel Level I, II,<br />

III, quals and certs NDE method,<br />

exam procedures)<br />

SC-14 Eng 5 1.2.C<br />

SC-14 Q 5 1.2.D<br />

SC-14 Q 5 1.2.E<br />

SC-14 Q 5 1.2.F<br />

SC-14 Q 5 1.2.G<br />

SC-14 Q 5 1.2.H<br />

5/17/2012 Modified KW Basin Annex Construction, Rev 0 7 of 46