Sample Form:<br />

CSI Masterformat Detail Report<br />

PROJECT NAME<br />

DATE<br />

PROJECT PHASE<br />

ESTIMATOR<br />

Quantity Material Labor<br />

Equipment/Other<br />

Unit<br />

Description Quantity UOM Unit Subtotal Unit Subtotal Unit Subtotal Total Cost<br />

02 Site Work<br />

1 Excavate trench; mdm soil,<br />

expose pipe, 1/2 CY excavator 16.8 EA $ 0.96 16.13 0.37 $6 $22 0.37<br />

2 Backfill by hand, no compaction<br />

light soil 16.8 EA $ 17.57 295.14 0.37 $6 $301 0.37<br />

3 Fill, spread borrow w/dozer 16.8 EA $ 0.41 6.96 0.37 $6 $13 0.37<br />

4 Backfill, by hand, compaction<br />

in 6” layers, ari tamp 16.8 EA $ 6.53 109.69 0.37 $6 $116 0.37<br />

Site Work Subtotal $ $7 $25 $453<br />

300<br />

A.1<br />

F A CILI TIES S T AND ARDS FOR THE PUBLIC BUILDINGS SER VICE<br />

General Requirements – Cost Estimating Requirements<br />

Revised March 2005 – PBS-P100