Sample Form:<br />
CSI Masterformat Detail Report<br />
PROJECT NAME<br />
DATE<br />
PROJECT PHASE<br />
ESTIMATOR<br />
Quantity Material Labor<br />
Equipment/Other<br />
Unit<br />
Description Quantity UOM Unit Subtotal Unit Subtotal Unit Subtotal Total Cost<br />
02 Site Work<br />
1 Excavate trench; mdm soil,<br />
expose pipe, 1/2 CY excavator 16.8 EA $ 0.96 16.13 0.37 $6 $22 0.37<br />
2 Backfill by hand, no compaction<br />
light soil 16.8 EA $ 17.57 295.14 0.37 $6 $301 0.37<br />
3 Fill, spread borrow w/dozer 16.8 EA $ 0.41 6.96 0.37 $6 $13 0.37<br />
4 Backfill, by hand, compaction<br />
in 6” layers, ari tamp 16.8 EA $ 6.53 109.69 0.37 $6 $116 0.37<br />
Site Work Subtotal $ $7 $25 $453<br />
300<br />
A.1<br />
F A CILI TIES S T AND ARDS FOR THE PUBLIC BUILDINGS SER VICE<br />
General Requirements – Cost Estimating Requirements<br />
Revised March 2005 – PBS-P100