Historic Preservation<br />

8.5" x 11" report, signed by qualified preservation<br />

architect, including<br />

Narrative.<br />

1. General: Project purpose, scope, groups and<br />

individuals involved <br />

2. Existing conditions, describing:<br />

– Overall building size, configuration, character<br />

– Project location<br />

– Existing original materials and design, relevant<br />

alterations<br />

3. Preservation design issues and prospective solutions,<br />

including:<br />

– Location of new work/installation: visibility,<br />

impact on historic finishes<br />

– Compare options for preserving/restoring historic<br />

materials and design<br />

– Identify further study required to avoid adverse<br />

effects as applicable<br />

Photographs.<br />

– General and detail views showing existing<br />

conditions at affected preservation zones, keyed to<br />

plan showing location and orientation of each<br />

view<br />

– Captions identifying location, subject, condition<br />

shown<br />

Drawings.<br />

Reduced to 8.5" x 11, 11" x 17" foldout or placed in cover<br />

pocket:<br />

– Site and floor plans, as applicable<br />

– Sketches or schematic CAD drawings (elevations,<br />

plans) showing preservation design concepts<br />

Structural<br />

Drawings.<br />

1. Plans, showing:<br />

– Framing plans of the proposed structural system<br />

showing column locations; bay sizes; and location<br />

of expansion and seismic joints.<br />

Narrative.<br />

1. Identification of any unusual local code<br />

requirements.<br />

2. Code compliance statement.<br />

– Name of model building code followed.<br />

– Building classification.<br />

– Identification of Region of Seismicity, wind speed,<br />

etc.<br />

– Identification of special requirements, such as<br />

highrise.<br />

3. For new buildings:<br />

– Statement certifying that the structural engineer<br />

has reviewed the building configuration for<br />

seismic adequacy, and the criteria outlined in<br />

Chapter 4, Structural Engineering, have been met.<br />

This statement must be signed by the structural<br />

engineer and the architect.<br />

Mechanical<br />

For the system approved and selected from the three<br />

concepts, provide the following:<br />

Drawings.<br />

1. Floor Plan(s):<br />

– Identification of equipment spaces for major<br />

equipment.<br />

– Location of major equipment, including size,<br />

weight, and clearance requirements.<br />

Revised March 2005 – PBS-P100<br />

SUBMISSION REQUIREMENTS<br />

New Construction and Modernizations – Final Concept<br />

311<br />