04.01.2014 Views

Village of Geneseo Circulation, Accessibility, and Parking Study

Village of Geneseo Circulation, Accessibility, and Parking Study

Village of Geneseo Circulation, Accessibility, and Parking Study

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Village</strong> <strong>of</strong> <strong>Geneseo</strong><br />

Alternatives to Improve <strong>Circulation</strong>, <strong>Parking</strong>, Safety <strong>and</strong> Aesthetics<br />

Route 39 / North Street / Court Street Corridor<br />

The promotional efforts <strong>of</strong> LATS <strong>and</strong> SUNY <strong>Geneseo</strong> Student <strong>and</strong> Campus Life Office have been<br />

effective. Since 2003, bus ridership has grown dramatically from 40,410 riders to 161,510 in 2009 as<br />

summarized in Table 8. During that period, the number <strong>of</strong> student residential parking permits has<br />

decreased from 2,292 to 1,006.<br />

Table 8. Livingston Area Transit Service (LATS) Bus Service Ridership in <strong>Geneseo</strong><br />

Year<br />

Local Daily<br />

Weekends<br />

to Rochester<br />

Total<br />

2003‐2004 36,590 3,820 40,410<br />

2004‐2005 61,829 4,378 66,207<br />

2005‐2006 82,320 5,613 87,933<br />

2006‐2007 104,899 7,155 112,054<br />

2007‐2008 133,337 6,726 140,063<br />

2008‐2009 152,732 8,778 161,510<br />

Source: Livingston Area Transit Service (LATS)<br />

Placement <strong>and</strong> design <strong>of</strong> new bus shelter facilities within the corridor would need to be<br />

consistent with the historic or residential character <strong>of</strong> the corridor. LATS has recently installed a bus<br />

shelter on Court Street within the corridor.<br />

It should also be noted that the <strong>Geneseo</strong> Central School District operates school buses in the<br />

corridor. North, Court, Lima <strong>and</strong> Main Street are all on the school system’s bus routes.<br />

Bicycle<br />

There were no counts taken <strong>of</strong> bicycles in the corridor, nor did traffic counters notice any<br />

bicycle circulation patterns in the study area. However, an assessment <strong>of</strong> bike facilities was<br />

completed.<br />

Currently, there is one bike rack on Main Street with four spaces next to Key Bank. In order to<br />

promote biking for recreation <strong>and</strong> transportation to work <strong>and</strong> school, additional bike racks would<br />

be necessary.<br />

The Bicycle Coalition <strong>of</strong> Massachusetts provides data on bicycle parking requirements for<br />

various communities throughout the United States. Most communities cited by the Coalition<br />

provide a minimum number <strong>of</strong> bicycle spaces equal to between 5 <strong>and</strong> 10 percent <strong>of</strong> the amount <strong>of</strong><br />

parking supplied at new commercial developments.<br />

<strong>Geneseo</strong> is a historic center that is already developed. However, using the same ratios,<br />

<strong>Geneseo</strong>’s Main Street area would need between 27 <strong>and</strong> 54 bicycle rack “parking” spaces to satisfy<br />

bicycle parking requirements in other communities.<br />

There was one bicycle safety issue in the corridor noted by the steering committee. The widths<br />

<strong>of</strong> sewer grate openings on Court Street were wider than st<strong>and</strong>ard bike tire.<br />

22 Existing Conditions, Plans <strong>and</strong> Public Input

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!