11.02.2014 Views

Ref: Stock 105' Aerial Specifications - R & R Fire Truck Repair, Inc.

Ref: Stock 105' Aerial Specifications - R & R Fire Truck Repair, Inc.

Ref: Stock 105' Aerial Specifications - R & R Fire Truck Repair, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Demo #3708 Smeal <strong>Fire</strong> Apparatus Co. 105’ Heavy Duty <strong>Aerial</strong><br />

All valve controls shall be the self locking type, activated by either direct control or with a direct<br />

linkage utilizing friction locking bell cranks and universal ball swivels. The primary valve handles<br />

shall have color coded tags installed in a recessed area to clearly denote the purpose of each<br />

control.<br />

INSTRUMENT PANEL<br />

The surface above the control panel shall contain all instruments, gauges, test fittings, and optional<br />

controls. This surface shall be referred to as the "instrument panel". The instrument panel shall<br />

be independent and hinged and latched so that it may be opened. All instruments, gauges, and<br />

other equipment shall be installed with sufficient slack in any cabling, tubing, or plumbing to allow<br />

the panel to swivel to the fully open position.<br />

The instrument and gauge panel shall be vertically hinged "swing out" to provide access for<br />

service.<br />

COLOR CODED LABELS<br />

To improve identification of discharges and intakes, color coded tags shall be provided. The tags<br />

shall utilize an etching process to provide easy visibility and improved field service life. Tags shall<br />

be affixed using an industrial grade adhesive backing, eliminating the need for pop rivets or screws<br />

into the panel or control handle.<br />

RIGHT SIDE PUMP PANEL<br />

A single panel shall be installed on the right side of the pump enclosure. This shall be the area<br />

where any right side discharges, inlets, steamers, and other pump associated equipment are<br />

located. This panel shall be easily removable and held in place with quick release push latches.<br />

It shall be fully removable for pump and plumbing access without the need to use hand tools. Any<br />

electrical equipment that may be installed shall be equipped with connectors so they may be easily<br />

separated from the opening created when the below described front access panel is removed.<br />

PUMP PANEL LIGHTS - HAVIS SHIELD<br />

The pump operator's control panel and the right side pump panel shall each be illuminated by<br />

Havis Shield "Cold Cathode pump panel lights.<br />

The pump panel lights shall become energized upon setting the parking brake so the gauge<br />

information provided may be consulted at any time the apparatus is parked.<br />

A stainless steel shield shall be installed over the pump panel lights to further protect them from the<br />

elements and to act as a reflector for additional illumination.<br />

PANEL SURFACES<br />

The control panel, instrument panel, and right side pump panel shall be coated with a thermoplastic<br />

material for maximum resistance to abrasion and to minimize glare. The material shall be capable<br />

of withstanding the effects of extreme temperatures and weather.<br />

PRESSURE / VACUUM TEST PORTS<br />

Class1 model 115100 pressure and vacuum test ports shall be provided on the pump panel.<br />

PUMP COOLER VALVE<br />

Class1 model 38BV pump cooling control valve shall be provided on the pump panel.<br />

Revised 3/19/09 Page 26 of 112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!