Kernersville B-40 & South - Town of Kernersville
Kernersville B-40 & South - Town of Kernersville
Kernersville B-40 & South - Town of Kernersville
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
mulch, and any other materials; pruning and planting; maintaining plants and grassed areas; and replacing<br />
dead, damaged, or stolen plants.<br />
REMOVAL<br />
The Contractor shall remove the designated trees, limbs and or underbrush as shown on the plan, in their<br />
entirety, from within the right <strong>of</strong> way in accordance with these specifications using sound established<br />
arboricultural principles or as directed by the <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong>. The Contractor shall cut only those<br />
trees, limbs, and /or underbrush that the Project Manager has identified for removal.<br />
The Contractor shall provide equipment to perform all work necessary to complete the job as listed. Work<br />
performed by the contractor shall be in compliance with the NCDOT Standard Specifications for Roads and<br />
Structures 2012 Manual and the NCDOT Guidelines for Planting within Right-<strong>of</strong>-Way Guidelines.<br />
Removal and Disposal <strong>of</strong> all trees, limbs, and/or underbrush produced by the above operation shall be the<br />
responsibility <strong>of</strong> the Contractor. All other debris must be removed from highway right <strong>of</strong> way before<br />
payment is made. No burning or burying <strong>of</strong> debris will be allowed on highway right <strong>of</strong> way.<br />
Trees that are to be removed shall have stumps ground in accordance with accepted industry practices to<br />
a minimum depth <strong>of</strong> (6) inches below the elevation <strong>of</strong> the surrounding area. Removal <strong>of</strong> any debris shall<br />
be the responsibility <strong>of</strong> the Contractor. Use <strong>of</strong> mulch generated on-site shall not be permitted.<br />
Contractor shall take precaution to save existing crape myrtles and dogwoods.<br />
Pay Item<br />
Removal<br />
Pay Unit<br />
LS<br />
PLANTING<br />
All planting shall follow the NCDOT Planting within Highway Right-<strong>of</strong>-Way Guidelines. Work shall be done<br />
in accordance Section 1670 PLANTING <strong>of</strong> the Standard Specifications for Roads and Structures. Any<br />
substitution shall be in the same color scheme and growth habit <strong>of</strong> the plants identified in the contract.<br />
Pay Item<br />
Trees<br />
Shrubs<br />
Ornamental Grass<br />
Flowers<br />
Pay Unit<br />
Each<br />
Each<br />
Each<br />
Each<br />
All plants that are not in a living and healthy condition within the one year warranty shall be replaced. No<br />
additional compensation will be made for replacement plants.<br />
All watering and maintenance <strong>of</strong> plants, seed, and grassed areas will be the responsibility <strong>of</strong> the<br />
Contractor throughout the duration <strong>of</strong> the contract until the final completion date. This work will be<br />
incidental to the contract.<br />
MULCH<br />
Do not re-use existing old mulch. All plants will be mulched within forty-eight (48) hours <strong>of</strong> planting.<br />
Mulch all trees/shrubs with 3 – 4 inches. Mulch stock piled on site shall not impede sight distance or<br />
cause potential hazard to vehicular and/or pedestrian traffic. Contractor shall provide appropriate load<br />
tickets to the owner specifying the quantity <strong>of</strong> material delivered.<br />
Pay Item<br />
Mulch<br />
Pay Unit<br />
Cubic Yard<br />
11509; WBS #: 3709.3.23 B<strong>40</strong> Interchange Landscape 57