14.02.2014 Views

Kernersville B-40 & South - Town of Kernersville

Kernersville B-40 & South - Town of Kernersville

Kernersville B-40 & South - Town of Kernersville

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

POST EMERGENT HERBICIDE<br />

Post Emergent Application for Plant Bed Preparation<br />

During “Initial Planting”, prior to tillage, Contractor shall successfully treat bed areas with herbicide as<br />

needed until all visible, actively growing, non-desirable plant material has been eliminated from the bed<br />

areas. This item is paid and included in the Plant Bed Herbicide Treatment.<br />

After plants are established, pre-emergent herbicides shall be used to control warm season and winter<br />

annuals. Selective herbicides shall be used to control emerged weeds. Hoeing shall not be allowed as a<br />

means <strong>of</strong> removing weeds as it has been determined to reduce plant performance. Failure to control<br />

weeds shall result in the forfeiture <strong>of</strong> payment. Negligence in weed control shall result in forfeiture <strong>of</strong><br />

performance bond. No additional payment shall be made for herbicide treatment as such shall be<br />

considered incidental to the work. Should non-selective herbicides be needed, care shall be taken to<br />

avoid contact with desirable plant material. The Contractor shall replace any desirable plant material that<br />

is damaged, to any degree, by misapplication or drift <strong>of</strong> herbicide. The <strong>Town</strong> <strong>of</strong> <strong>Kernersville</strong> will not<br />

participate in the cost <strong>of</strong> such replacement planting.<br />

Pay Item<br />

Post Emergent Herbicide<br />

Pay Unit<br />

Gallon<br />

FERTILIZER<br />

14-14-14 blend shall be applied during “Initial Planting” at the rates as recommended listed on the<br />

manufacturer label. Fertilizer shall be placed in the planting hole, being evenly distributed within the<br />

backfill material. Fertilizer type(s) and quantity shall be discussed with and approved by the <strong>Town</strong> prior to<br />

incorporation in plant beds.<br />

The Contractor will not be directly compensated for the work <strong>of</strong> final cleaning up, as this work will be<br />

considered incidental to the work covered by the various contract items.<br />

Pay Item<br />

Fertilizer<br />

Pay Unit<br />

Bag<br />

GROUND CLOTH<br />

Non-woven ground cloth shall be used in planting areas.<br />

Pay Item<br />

Ground cloth<br />

Pay Unit<br />

SY<br />

SEEDING<br />

Seeding is intended for areas where trees are to be removed. The rate <strong>of</strong> application shall be 5-10 pound<br />

<strong>of</strong> tall fescue grass per 1000 sq. feet.<br />

Pay Item<br />

Seeding<br />

Pay Unit<br />

SF<br />

NCDOT GENERAL SEED SPECIFICATION FOR SEED QUALITY:<br />

(5-17-11) Z-3<br />

Seed shall be sampled and tested by the North Carolina Department <strong>of</strong> Agriculture and Consumer<br />

Services, Seed Testing Laboratory. When said samples are collected, the vendor shall supply an<br />

independent laboratory report for each lot to be tested. Results from seed so sampled shall be final. Seed<br />

not meeting the specifications shall be rejected by the Department <strong>of</strong> Transportation and shall not be<br />

11509; WBS #: 3709.3.23 B<strong>40</strong> Interchange Landscape 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!