Field Trial of Optical Fibre Cable-TV System Optical Fibre System for ...
Field Trial of Optical Fibre Cable-TV System Optical Fibre System for ...
Field Trial of Optical Fibre Cable-TV System Optical Fibre System for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fig. 9<br />
Rectifier BMJ A01 001 with the front panel open,<br />
showing the inner front panel, which provides<br />
screening. A simplified circuit diagram is printed<br />
on this panel, and the measuring instrument and<br />
LEDs are mounted in the top left-hand corner. The<br />
operating handle <strong>for</strong> the output switch is placed<br />
in the bottom left-hand corner.<br />
Fig. 8<br />
Rectifier BMJ 401 001 with the outer front panel<br />
closed. The cut-out in the panel gives access to<br />
the electronic measuring instrument <strong>for</strong> voltage<br />
and current, the light emitting diodes that indicate<br />
operating states and the control switch (<strong>for</strong><br />
selecting the operating mades ON, OFF/RESET or<br />
CHARGE). The output switch is placed on the left<br />
side <strong>of</strong> the unit. It connects the rectifier output<br />
circuit to bars in the rack<br />
The components on the mains side are<br />
installed in screened compartments in<br />
order to minimize the conducted interference<br />
to the mains. Heavy components,<br />
such as chokes, trans<strong>for</strong>mers and<br />
the large electrolyte capacitors, are<br />
mounted in the per<strong>for</strong>ations in the unit<br />
frame. The plug-in printed board assemblies<br />
are held by guide rails in the case.<br />
The unit has an inner and an outerfront<br />
panel. All control devices and instruments<br />
are mounted on the inner panel.<br />
Only items needed <strong>for</strong> normal operation<br />
are accessible through the outer panel,<br />
fig. 8.<br />
HMIMMI<br />
Installation<br />
The system construction ensures easy<br />
installation and rapid putting into operation.<br />
Each rack in BZA20108 is delivered<br />
on site as a fully tested unit equipped<br />
with a distribution unit, battery fuse<br />
unit and rectifier. When the equipment<br />
in installed it is only necessary to check<br />
that there is no transport damage. The<br />
installation work consists merely <strong>of</strong> setting<br />
up the racks and connecting mams<br />
cables and distribution cables.<br />
The rectifier is designed <strong>for</strong> high personal<br />
safety. All live parts are inaccessible<br />
even when the outer front panel is