19.02.2014 Views

download - DIA Business Center Home Page - Denver International ...

download - DIA Business Center Home Page - Denver International ...

download - DIA Business Center Home Page - Denver International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TECHNICAL SPECIFICATIONS<br />

DENVER INTERNATIONAL AIRPORT<br />

DIVISION 1 – GENERAL REQUIREMENTS<br />

RUNWAY 17R-35L COMPLEX PAVEMENT REHABILITATION<br />

SECTION 01410 - CUTTING AND PATCHING CONTRACT NO.: 201208806<br />

6. Effect on the work and other surrounding work or on structural or weatherproof integrity<br />

of project<br />

7. Written concurrence of each contractor or entity whose work will be affected.<br />

8. Cost proposal, when applicable<br />

1.04 QUALITY CONTROL<br />

A. Operational Elements: Do not cut and patch the following operating elements and related<br />

components in a manner that results in reducing their capacity to perform as intended or that<br />

results in increased maintenance, decreased operational life or safety unless approved by<br />

the Project Manager:<br />

1. Primary operational systems and equipment<br />

2. Air or smoke barriers<br />

3. Fire protection systems<br />

4. Control systems<br />

5. Communication systems<br />

6. Conveying systems<br />

7. Electrical wiring systems<br />

8. Operating systems of special construction as described in Division 13 and 16<br />

9. HVAC systems.<br />

B. Miscellaneous Elements: Do not cut and patch the following elements or related components<br />

in a manner that could change their load-carrying capacity, that results in reducing their<br />

capacity to perform as intended, or those results in increased maintenance, decreased<br />

operational life or safety unless approved by the Project Manager:<br />

1. Water, moisture or vapor barriers<br />

2. Membranes and flashings<br />

3. Exterior curtain wall construction<br />

4. Equipment supports<br />

5. Piping, ductwork, vessels and equipment<br />

6. Noise control and vibration control elements and systems<br />

7. Stud walls.<br />

C. Visual Elements: Do not cut and patch construction in a manner that results in visual<br />

evidence of cutting and patching. Do not cut and patch construction exposed on the exterior<br />

or in occupied spaces in a manner that would, in <strong>DIA</strong>’s sole opinion, reduce the building’s<br />

aesthetic qualities. Remove and replace construction that has been cut and patched in a<br />

visually unsatisfactorily manner.<br />

1. If possible, retain the original installer or fabricator to cut and patch exposed Work listed<br />

below. If it is impossible to engage the original installer or fabricator, engage another<br />

recognized, experienced and specialized firm as approved by the Project Manager:<br />

a. Processed concrete finishes<br />

b. Stonework and stone masonry<br />

ISSUED FOR BID: 11/26/2012 RS&H Revision No. 2012<br />

01410 - 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!