Vision 2020 - Transportation Research Group of India
Vision 2020 - Transportation Research Group of India
Vision 2020 - Transportation Research Group of India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Government <strong>of</strong> <strong>India</strong><br />
Ministry <strong>of</strong> Railways<br />
(Railway Board)<br />
38 Khurda Road-Puri (Delang -Puri) Orissa 29<br />
39 Sambalpur-Talcher Orissa 168<br />
40 Koraput-Kirandul (256 km) Orissa, Chhatisgarh 150<br />
41 Rajpura - Bathinda Punjab 174<br />
42 Bandikui-Alwar Rajasthan 60<br />
43 Phulera to Merta Rd Rajasthan 153<br />
44 Chengalpattu-Tuticorin Tamilnadu 513<br />
45 Chennai Central-Villivakkam 5th & 6th line Tamilnadu 152<br />
46 Doubling <strong>of</strong> Salem(Magnesite)-Omalur-Mettur Dam Tamilnadu 37<br />
47 Laksar-Haridwar-Dehradun Uttarakhand 79<br />
48 Aligarh-Ghaziabad 4th line Uttar Pradesh 103<br />
49 Aunrihar-Varanasi-Manduadih Uttar Pradesh 39<br />
50 Ghaziabad-Panki Ph II (Tundla-Aligarh -3rd line Uttar Pradesh 78<br />
51 Khurja-Hapur-Meerut Uttar Pradesh 93<br />
52 Lohta-Jhangai Uttar Pradesh 75<br />
53 Lucknow-Malhaur Uttar Pradesh 20<br />
54 Lucknow-Varanasi via Bareilly and Amethi Uttar Pradesh 281<br />
55 Meerut-Saharanpur Uttar Pradesh 114<br />
56 Panki-Mughalsarai 3rd line Uttar Pradesh 356<br />
57 Panki-Tundla -3rd line Uttar Pradesh 219<br />
58 Shahadra-Shamli Uttar Pradesh 87<br />
59 Shikohabad-Farukkabad Uttar Pradesh 106<br />
60 Baruipur and Sealdah(Ballygunge) (3rd line ) West Bengal 20<br />
61 Burnpur-Asansol West Bengal 5<br />
62 Howrah- Bandel 4th line West Bengal 39<br />
63 Jirat-Katwa West Bengal 83<br />
64 Kharagpur-Midnapore via Girimaidan West Bengal 8<br />
65 Lalgola-Krishnanagar with electrification West Bengal 127<br />
66 Rajgoda-Durga Chak & Durga Chak Haldia West Bengal 54<br />
67 Santipur-Kalinarayanpur West Bengal 16<br />
68 Sealdah-Dum Dum 5th & 6th line West Bengal 7<br />
69 Shaktigarh-Dankuni 4th line West Bengal 128<br />
70 New Jalpaiguri-New Alipurduar West Bengal, Assam 168<br />
Total for doubling 9236<br />
Note:<br />
The list <strong>of</strong> surveys completed but projects not taken up have been prepared based on available records.<br />
Since the surveys in the list date back to the year 1947, the ground realities over the years have changed considerably<br />
in the intervening years. As such, the assessment <strong>of</strong> the cost arrived at in those surveys may not be realistic cost<br />
estimates on date. Accordingly, the present day costs for new lines, gauge conversions and doublings being incurred<br />
presently for such works have been used as a basis for assessing the cost <strong>of</strong> the earlier surveys.<br />
APPROXIMATE COST ESTIMATES Fig. in Rs. Crore<br />
Total cost for new lines 359068<br />
Total cost for gauge conversions 16298<br />
Total cost for doubling. 46180<br />
Total for New Lines, Gauge Conversions and Doublings 421546<br />
54