06.03.2014 Views

Vision 2020 - Transportation Research Group of India

Vision 2020 - Transportation Research Group of India

Vision 2020 - Transportation Research Group of India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government <strong>of</strong> <strong>India</strong><br />

Ministry <strong>of</strong> Railways<br />

(Railway Board)<br />

38 Khurda Road-Puri (Delang -Puri) Orissa 29<br />

39 Sambalpur-Talcher Orissa 168<br />

40 Koraput-Kirandul (256 km) Orissa, Chhatisgarh 150<br />

41 Rajpura - Bathinda Punjab 174<br />

42 Bandikui-Alwar Rajasthan 60<br />

43 Phulera to Merta Rd Rajasthan 153<br />

44 Chengalpattu-Tuticorin Tamilnadu 513<br />

45 Chennai Central-Villivakkam 5th & 6th line Tamilnadu 152<br />

46 Doubling <strong>of</strong> Salem(Magnesite)-Omalur-Mettur Dam Tamilnadu 37<br />

47 Laksar-Haridwar-Dehradun Uttarakhand 79<br />

48 Aligarh-Ghaziabad 4th line Uttar Pradesh 103<br />

49 Aunrihar-Varanasi-Manduadih Uttar Pradesh 39<br />

50 Ghaziabad-Panki Ph II (Tundla-Aligarh -3rd line Uttar Pradesh 78<br />

51 Khurja-Hapur-Meerut Uttar Pradesh 93<br />

52 Lohta-Jhangai Uttar Pradesh 75<br />

53 Lucknow-Malhaur Uttar Pradesh 20<br />

54 Lucknow-Varanasi via Bareilly and Amethi Uttar Pradesh 281<br />

55 Meerut-Saharanpur Uttar Pradesh 114<br />

56 Panki-Mughalsarai 3rd line Uttar Pradesh 356<br />

57 Panki-Tundla -3rd line Uttar Pradesh 219<br />

58 Shahadra-Shamli Uttar Pradesh 87<br />

59 Shikohabad-Farukkabad Uttar Pradesh 106<br />

60 Baruipur and Sealdah(Ballygunge) (3rd line ) West Bengal 20<br />

61 Burnpur-Asansol West Bengal 5<br />

62 Howrah- Bandel 4th line West Bengal 39<br />

63 Jirat-Katwa West Bengal 83<br />

64 Kharagpur-Midnapore via Girimaidan West Bengal 8<br />

65 Lalgola-Krishnanagar with electrification West Bengal 127<br />

66 Rajgoda-Durga Chak & Durga Chak Haldia West Bengal 54<br />

67 Santipur-Kalinarayanpur West Bengal 16<br />

68 Sealdah-Dum Dum 5th & 6th line West Bengal 7<br />

69 Shaktigarh-Dankuni 4th line West Bengal 128<br />

70 New Jalpaiguri-New Alipurduar West Bengal, Assam 168<br />

Total for doubling 9236<br />

Note:<br />

The list <strong>of</strong> surveys completed but projects not taken up have been prepared based on available records.<br />

Since the surveys in the list date back to the year 1947, the ground realities over the years have changed considerably<br />

in the intervening years. As such, the assessment <strong>of</strong> the cost arrived at in those surveys may not be realistic cost<br />

estimates on date. Accordingly, the present day costs for new lines, gauge conversions and doublings being incurred<br />

presently for such works have been used as a basis for assessing the cost <strong>of</strong> the earlier surveys.<br />

APPROXIMATE COST ESTIMATES Fig. in Rs. Crore<br />

Total cost for new lines 359068<br />

Total cost for gauge conversions 16298<br />

Total cost for doubling. 46180<br />

Total for New Lines, Gauge Conversions and Doublings 421546<br />

54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!