06.03.2014 Views

Vision 2020 - Transportation Research Group of India

Vision 2020 - Transportation Research Group of India

Vision 2020 - Transportation Research Group of India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Vision</strong> <strong>2020</strong>-Errata<br />

Para & Page No. Existing To be read as<br />

Para 5(c) page -iv “free distribution <strong>of</strong> 26 “free distribution <strong>of</strong> 2.6 million<br />

million CFLs”<br />

CFLs”<br />

Para 6.5 (c ) page “As many as 26 million<br />

30<br />

CFLs”<br />

Para 9 (c ) page 61 “Power plants would be<br />

set up at Nabinagar and<br />

Adra through the existing<br />

Joint Venture with NTPC<br />

to meet the increased<br />

energy requirements<br />

from 2500 MW to 6000<br />

MW to reduce energy<br />

cost.”<br />

Para 10 (f) page 61 “On board train<br />

protection/collision<br />

prevention systems such<br />

as the ACD <strong>of</strong> KRCL,<br />

would be installed to<br />

avoid collision and driver<br />

passing signal at danger.”<br />

“As many as 2.6 million CFLs”<br />

“Power plant at Nabinagar is being<br />

set up in Joint Venture with NTPC. A<br />

captive power plant at Adra would be<br />

set up through competitive bidding.<br />

This will meet a major part <strong>of</strong> IR’s<br />

increased energy requirement (going<br />

up from 2500 MW to 6000 MW) and<br />

reduce energy cost.”<br />

“On board train protection/collision<br />

prevention systems including ACD<br />

would be installed after successful<br />

trials and tests to avoid collision and<br />

driver passing signal at danger.”<br />

Sd/-<br />

(S.K.Mishra)<br />

ED/Traffic/PPP<br />

23-02-2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!